{
  "fields": [{"id":"_id","type":"int"},{"id":"ANTEPROYECTO","type":"text"},{"id":"FECHA DE PC","type":"text"},{"id":"NO. DE PERMISO","type":"text"},{"id":"NO. DE PLANO","type":"text"},{"id":"CONSTRUCTOR","type":"text"},{"id":"PROPIETARIO","type":"text"},{"id":"CATEGORIA","type":"text"},{"id":"CORREGIMIENTO","type":"text"},{"id":"UBICACION","type":"text"},{"id":"TIPO DE CONSTRUCCION","type":"text"},{"id":"AREA MT2","type":"text"},{"id":"FINCA","type":"text"},{"id":"INVERSION","type":"text"},{"id":"TASA","type":"text"}],
  "records": [
    [1,"RLA-2466","2026-01-07 00:00:00","ATC-608","POA-74-2026  RDP-5844","RAMÓN JAVIER PINZÓN MOSQUERA","NORIELA MARIA TEJERA RODRIGUEZ","RESIDENCIA","ANCÓN","LLANOS DE CURUNDÚ. CALLE 6TA.  LOTE: 2144","RESIDENCIA UNIFAMILIAR","ÁREA A CONSTRUIR 237.43 M2","30308380","213687","2136.87"],
    [2,"NO APLICA","2026-02-07 00:00:00","ATC-623","PMA-469-2026  RDPM-11214","GAMF TECNOLOGIA, S.A.","INMOBILIARIA ROSALINDA, S.A.","RESIDENCIA","LAS CUMBRES","LUCHA FRANCO SUR. CALLE PRINCIPAL","CONTROL DE EROSION EN TALUD VILLA BELLA","CONSISTE EN : MAMPOSTERIA CON MORTERO 70 M3.  LLORONES DE PVC DE 3\" 2 UNIDADES, BIOMANTO 955 M2.","143977","13337.5","133.38"],
    [3,"RLA-1817","2026-02-07 00:00:00","ATC-536","POD-298-2024  RDP-5185","CARLOS ALBERTO CEDEÑO ABREGO","ASSETS TRUST & CORPORATE  SERVICES INC.  /  DESARROLLADORES DE PROYECTOS Y URBANIZACIONES, S.A.","RESIDENCIA","PACORA","SANTA CLARA. CALLE BOULEVARD VILLA DEL ESTE","CASA MODELO CEREZO - RESIDENCIAL VILLA DEL ESTE ETAPA 1  LOTES 1A @ 130 A",null,"31210","3702218","24761.09"],
    [4,"NO APLICA","2026-08-07 00:00:00","ATC-613","PMA-434-2026  RDPM-11169","ANABELLA FILIA LEE MEDINA","RODRIGO JOSÉ RIBA GONZÁLEZ","RESIDENCIA","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB. CALLE SANTA  MARÍA PH THE CRESCENT. LOTE:  UI 5 MODELO B","ANEXO A DUPLEX ADOSADA DE PLANTA BAJA Y PLANTA ALTA CON ESTRUCTURA METÁLICA","ÁREA A CONSTRUIR=67.00M²","30245644","30820","308.2"],
    [5,"RLA-1884","2026-08-07 00:00:00","ATC-601","PO-HAD-09-2026  RDP-5853","CONSTRUCTORA DON BOSCO, S.A.","PACORA DEL ESTE DEVELOPMENT, S.A.PROVENZA DEVELOPMENT INTERNATIONAL, CORP.","EDIFICIO","LAS GARZAS","CALLE SAN DIEGO","PTAR Y TRATAMIENDO DE AGUA POTABLE","PROYECTO P.H. PROVENZA: PTAR Y TRATAMIENDO DE AGUA POTABLE.","30430027","281862","2818.62"],
    [6,"S/N","2026-09-07 00:00:00","ATC-620","POC-113-2026  RDP-5912","INGENIERIA R.M., S.A.","JUAN RAÚL HUMBERT ARIAS","EDIFICIO","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB. CALLE 6TA. SUR. LOTE 6","PROYECTO LAKE - H.","EDIFICIO DE APARTAMENTOS. ETAPA DE FUNDACIONES.","30138977","912890.28","10161.13"],
    [7,"RLA-2324/3","2026-10-07 00:00:00","ATC-632","POB-90-2026  RDP-5873","VERTICAL PANAMÁ, S.A.","CORPORACIÓN FINANCIERA COLOMBO PANAMEÑA, S.A.","COMERCIAL","BELLA VISTA","OBARRIO. CALLE MANUEL MARÍA ICAZA. LOTE: G-5","EDIFICIO DE OFICINAS PLANTA BAJA + 2 NIVELES SUCURSAL GNB","ÁREA A CONSTRUIR=1860.68M²","15172 (F) 86","930340","10379.25"],
    [8,"NO APLICA","2026-10-07 00:00:00","ATC-630","PMA-490-2026  RDPM-11228","JOSÉ GUILLERMO SIBLESZ BRANDT","CODEG, S. A.INMOBILIARIA ALBROOK, S.A.","COMERCIAL","ANCÓN","C.C. ALBROOK MALL. VÍA MARGINAL","ADECUACIÓN DE LOCAL COMERCIAL PARA EL ESTABLECIMIENTO DE FRANQUICIA DULCE CANELA PANAMÁ. C.C.ALBROOK MALL LOCAL PB-64J","ÁREA A INTERVENIR=117.00M²","391400","87750","877.5"],
    [9,"RDP-5914","2026-10-07 00:00:00","ATC-605","PO-HAA-53-2025  RDP-5914","YADWINA MILITINA CREDIDIO LONG","COASTAL VIEW ENTERPRISES INCKOTOWA COFFEEHOUSE, S.A.","COMERCIAL","CALIDONIA","LA EXPOSICIÓN. AVENIDA JUSTO ARODEMENA Y 39 ESTE","PROYECTO KOTOWA JUSTO AROSEMENA: INSTALACIÓN CONTENEDOR PARA CAFETERÍA, INCLUYE ÁREA DE MESAS, SERV. SANITARIO Y DEPÓSITO","ÁREA A CONSTRUIR=69.59M²","10509","34795","347.95"],
    [10,"RLA-1769","13/07/2026","ATC-408","PO-HAB-132-2024  RDP-5722","MANUEL FERRER CARDENAS APOLAYO","INMOBILIARIA MILLA 9, S.A.","COMERCIAL","ERNESTO CÓRDOBA CAMPOS","MILLA 9. TRANSISTMICA. LOTE: 10, 11 Y 12","CONSTRUCCIÓN DE GALERA PARA BODEGA Y ÁREA DE OFICINA, PARQUE INDUSTRIAL MILLA 9.","ÁREA A CONSTRUIR= 20755M² NUEVO COMERCIAL - GALERAS=29,569.42m².","35858 35087 119382","9339750","52948.75"],
    [11,"RLA-2658","14/07/2026","ATC-629","POC-125-2026  RDP-5931","JOSÉ ALEJANDRO PRIETO DE LAS CASAS","COOPERATIVA DE AHORRO Y CRÉDITO EL EDUCADOR, R.L.","COMERCIAL","24 DE DICIEMBRE","VISTA HERMOSA. AVENIDA JOSÉ AGUSTÍN ARANGO (ANTIGUA CARRETERA NACIONAL)  CENTRO RECREATIVO FUCER","FUCER","CONSTRUCCIÓN DE PISCINA, ÁREA DE CMENSALES Y RANCHITOS","49923 (F)","289850","2898.5"],
    [12,"NO APLICA","14/07/2026","ATC-637","PMA-504-2026  RDPM-11243","SERVICIOS DE INGENIEROS Y ARQUITECTOS CONSULTORES, S.A.","GIAN CARLO GALINA QUINTERO","EDIFICIO","SAN FRANCISCO","VÍA ISRAEL","REMODELACIÓN DE APARTAMENTO No.36B T1 EN P.H. TERRAWIND","ÁREA A INTERVENIR=137.00M²","88888","34250","342.5"],
    [13,"RLA-2440","15/07/2026","ATC-602","POC-100-2025  RDP-5421","GILBERTO RODÍIGUEZ REYES","WEIXIONG XIAN","COMERCIAL","24 DE DICIEMBRE","FELIPILLO. CALLE JOSÉ AGUSTÍN ARANGO . LOTES: 13-14-15","CONSTRUCCIÓN DE SUPERMERCADO Y LOCALES COMERCIALES.","ÁREA A CONSTRUIR= 793.27M²; ÁREA DE ESTACIONAMIENTOS=282.25M²","195705, 226420, 184137","424860","4248.6"],
    [14,"NO APLICA","17/07/2026","ATC-641","PMA-523-2026  RDPM-11261","GRUPO J & R INC.","INVERSIONES DAS MARINAS, S.A.","COMERCIAL","BELLA VISTA","URBANIZACIÓN MARBELLA. CALLE 50 CON  CALLE 53","REMODELACIÓN DE OFICINAS, PISO 4 EN P.H. PLAZA 2000.","ÁREA A INTERVENIR=38.65M²","5690","28987.5","289.88"],
    [15,"NO APLICA","17/07/2026","ATC-581","PMA-359-2026  RDPM-11091","INCIMA PROYECTOS","FACTORY FASHION PANAMA CORP.","EDIFICIO","BETANIA","LA ALAMEDA. AVENIDA EL PAICAL EDIFICIO F. CORP.. LOTE 2","REFORZAMIENTO DE LOSA EXISTENTE EN PROYECTO FACTORY FASHION EDIFICIO F. CORP.","TRAMOS DE VIGAS METÁLICAS. 44U.","37123","5280","52.8"],
    [16,"NO APLICA","20/07/2026","ATC-410","PMA-155-2026  RDPM-10887","CEBALLOS LAMBIZ EVARISTO","IMPORTADORA Y EXPORTADORA NIMAR, S.A.  / PARQUE LOGISTICO METROPOLITANO, S.A.","COMERCIAL","JUAN DÍAZ","SAN CRISTOBAL. CALLE 112 OESTE","REFORMA A GALERA NIMAR","CONSISTE EN : DEMOLICIÓN ESTRUCTURA DE CONCRETO. A=108.51M²; TECHO CON CERCHAS Y ESTRUCTURA DE ACERO GALV. A=707M²; REVESTIMIENTO DE PISOS Y PAREDES. A=108.51M²; PAVIMENTOS. A= 477.65M²","14472","71476.85","714.77"],
    [17,"NO APLICA","20/07/2026","ATC-586","PMA-352-2026  RDPM-11084","INDUSTRIAS CATTAN, S.A.","P.H. SLI","RESIDENCIA","JUAN DÍAZ","URBANIZACIÓN SANTA MARÍA BUSINESS DISTRICT. CALLE BOULEVARD ESTE PH SLI","PROYECTO P.H. SLI PANAMA: INSTALACIÓN DE CUBIERTAS DE TERMOPANEL EN AZOTEA EN EDIFICACIÓN EXISTENTE.","ÁREA A INTERVENIR=298.40M²","367591","22380","223.8"],
    [18,"RLA-I-378","20/07/2026","ATC-625","POB-95-2026  RDP-5885","JESÚS ARMANDO PIMENTEL VÁLDES","SG URBANO, S.A.UB GROUP INVESTMENT CORP,","COMERCIAL","SAN FRANCISCO","COCO DEL MAR. AVENIDA CINCUENTENARIO. LOTE D","INSTALACIÓN DE CONTENEDORES (2)","PARA TIENDA DE VENTAS PARA PLANTAS INCLUYE BODEGA, OFICINAS 29.50M2","12981/164","22000","220"],
    [19,"RLA-1422","21/07/2026","ATC-631","POC-124-2026  RDP-5930","KRONO CONSTRUCCIONES INTERNACIONAL, S.A.","PEGA HORIZON, S.A","EDIFICIO","BELLA VISTA","URBANIZACIÓN MARBELLA. CALLE LAS ACACIAS. LOTE 27","PH PALY","ÁREA DE CONSTRUCCIÓN  10204.34 M2.","28702","5102170","31760.85"],
    [20,"NO APLICA","23/07/2026","ATC-650","PMA-259-2026  RDPM-11270","DESIGN AND CONSULTING ENGINEERING GROUP, S.A. (DCE)","FUNDACIÓN GQ E HIJOS","COMERCIAL","JUAN DÍAZ","URBANIZACIÓN SANTA MARÍA BUSINESS DISTRICT. CALLE BOULEVARD SANTA MARÍA","REMODELACIÓN DE OFICINAS N° 806 PISO 8 OFFICE PLEX 71\" EN P.H. SMOP 70 Y 71","ÁREA A INTERVENIR=98.00M²","464867","73500","735"],
    [21,"NO APLICA","23/07/2026","ATC-652","PME-515-2026  RDPM-11262","SURFACES AND PROTECTION ENGINEERING INC (SUPRO)","JUNTA COMUNAL DE LAS CUMBRES","INSTITUCIONAL","LAS CUMBRES","JUNTA COMUNAL DE LAS CUMBRES","CONSTRUCCIÓN DE MARQUESINA PARA LA COMUNIDAD DE LAS LAJAS.","VIGAS Y COLUMNAS DE HORM. INCLUYE FORMALETAS Y ACERO. 6.15M³; PAVIMENTOS DE 0.10M ESP. A=547.95M²; TECHO DE ACERO GALV. A=787.00M²","S/N","54586.25","545.86"],
    [22,"NO APLICA","23/07/2026","ATC-644","PMA-493-2026  RDPM-11231","JORGE RAMÓN ADÁMES MÚÑOZ","AROPECUARIA, S.A.","COMERCIAL","24 DE DICIEMBRE","NUEVO TOCUMEN. CARRETERA INTERAMERICANA","VÍA DE ACCESO VEHICULAR PARA CONEXIÓN ENTRE LA PANAMERICANA Y LA AVENIDA 100","ÁREA A INTERVENIR/PAVIMENTO HORM.=45.00M²","240112","2025","20.25"],
    [23,"NO APLICA","24/07/2026","ATC-636","PMA-506-2026  RDPM-11245","ICONOS PANAMÁ, S.A.","DRIJA COMPANY, S.A.","COMERCIAL","JUAN DÍAZ","URBANIZACIÓN SANTA MARÍA BUSINEES DISTRICT. CALLE BOULEVARD OESTE","REMODELACIÓN INTERNA DE OFICINAS DE DRIJA,PISO 12 LOCALES No.1201, 1202, 1203 Y 1204 EN P.H. PRIME 507 SANTA MARÍA BUSINESS DISTRICT.","ÁREA A INTERVENIR=576.57M²","30191572, 30191573, 30191574, 30191575.","432427.5","4324.28"],
    [24,"NO APLICA","24/07/2026","ATC-665","PMA-458-2026  RDPM-11227","PITTI GONZÁLEZ ADALBERTO","BRIGHTSATAR MANAGEMENT CORP.","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE.     AVENIDA CENTENARIO","REMODELACIÓN DE OFICINA EXISTENTE, LOCAL No.916 PISO 9 EN P.H. DREAM PLAZA.","ÁREA A INTERVENIR=135.30M²","30273530","67650","676.5"],
    [25,"NO APLICA","24/07/2026","ATC-663","PME-546-2026  RDPM-11286","INVERSIONISTAS DE CONTRUCCIÓN","EMPRESA DE TRANSMISIÓN ELÉCTRICA, S.A.","INSTITUCIONAL","ANCÓN","TORRES 75@79 EN LINEA LTI VELADERO","ADECUACIÓN DE CAMINOS A TORRES T75, T79, T96, T97, T102, T109, T112, T120, T121-T129, T133T, T137T, T139P-T144P, T146P, T150P, T150AP, T152, T152P, T160A, T162 Y T165.  SUMINISTRO, MONTAJE, COMISIONADO, PUESTA EN SERVICIO Y OBRAS CIVILES PARA EL AUMENTO DE CAPACIDAD DE LA LÍNEA LTI VELADERO-LLANO SÁNCHEZ 320kV; LLANO SÁNCHEZ-EL HIGO 230kV Y EL HIGO-PANAMÁ 230kV.","ÁREA A INTERVENIR=15845M²","S/N","87147.5","871.48"],
    [26,"NO APLICA","27/07/2026","ATC-660","PMA-520-2026  RDPM-11258","MANFREDO CRISTEL ZACHRISSON SHARIM","LATAM SPECIALTY COFFEE, S.A.","COMERCIAL","BELLA VISTA","CALLE 50","REMODELACIÓN DE LOCAL COMERCIAL COSTA COFFEE Y ACAI EXPRESS, LOCAL N.01 EN EDIFICIO P.H. PANAMERICAN LIFE PLAZA","ÁRE A INTERVENIR= 246.39M²","21238","123195","1231.95"],
    [27,"NO APLICA","27/07/2026","ATC-666","PMA-499-2026  RDPM-11237","CONSTRUCTORA DOCABO, S.A.","BANCOLOMBIA (PANAMÁ), S.A.","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE. AVENIDA CENTENARIO","REMODELACIÓN A LOCALES EXISTENTES EN NIVELES 14 Y 15 PARA BANCOLOMBIA, LOCALES No.1401, 1402, 1501 Y 1502 EN P.H. DREAM PLAZA.","BANCOLOMBIA (PANAMÁ), S.A.","30273575, 30273576, 30273577, 30273578","3150000","22000"],
    [28,"NO APLICA","27/07/2026","ATC-672","PMA-540-2026  RDPM-11280","INGENIERIA HOS, S.A.","INGENIERIA HOS, S.A.","COMERCIAL","JUAN DÍAZ","URBANIZACIÓN SANTA MARÍA BUSINESS DISTRICT.","REMODELACIÓN DE OFICINA 1005 EN EDIFICIO SANTA MARÍA OFFICE PLEX 71, PISO 10.","ÁREA A INTERVENIR= 240.00M²","464900","180000","1800"],
    [29,"RLA-I-238","27/07/2026","ATC-639","POC-102-2026  RDP-5895","GRUPO DE INGENIEROS CONTRATISTAS, S.A.","EUPHORIA STATE, S.A. GLOBAL FINANCIAL FUNDS CORP.","EDIFICIO","SAN FRANCISCO","PUNTA PACÍFICA. CALLE B. LOTE: 4","P.H. EUPHORIA -1 ETAPA FUNDACIONES","ETAPA DE FUNDACIONES. VACIADO TOTAL DE CONCRETO DE LOS ELEMENTOS CONSTRUCTIVOS 3024.25 M3: CONSTRUCCIÓN DE PILOTES, CABEZALES, VIGAS SISMICAS, MURO DE RETENCIÓN, TANQUE SOTERRADO Y ARRANQUES DE COLUMNAS Y SHEAR WALL","23863","756062.5","8200.78"],
    [30,"RLA-2688","28/07/2026","ATC-534","POA-31-2026  RDP-5757","GRUPO AIC, S.A. (ARQUITECTURA, INGENIERÍA Y CONSTRUCCIÓN)","ANA JULIA CRUZ DE DÍAZ","RESIDENCIA","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB. CALLE 4D","PH PENINSULA STATE CONSTRUCCIÓN DE RESIDENCIA DÍAZ CRUZ.","ÁREA A CONSTRUIR=857.00M²","30468932","771300","8391.25"],
    [31,"NO APLICA","28/07/2026","ATC-657","PMA-579-2025  RDPM-9716","VILLARREAL ABREGO LEISSA MARISA","TERASUR, S.A.","COMERCIAL","CHILIBRE","BUENOS AIRES","INSTALACIÓN DE TORRE DE TELECOMUNICACIONES","TERA 36 CERCA DE CICLON A 2.10M ALTO=33.00M.L.; PAREDES DE BLOQUES 4\"=2.10M²; CIMIENTOS DE BLOQUES 8\"=32.00M²; LOSAS DE HORM.=24.00M²; ESCALERAS DE METAL Y CIRCULAR=10.00M²","88302","8646.5","86.47"],
    [32,"NO APLICA","28/07/2026","ATC-658","PMA-580-2025  RDPM-9715","VILLARREAL ABREGO LEISSA MARISA","TERASUR, S.A.","COMERCIAL","PEDREGAL","VILLA LOBOS. CALLE LA PRIMAVERA","INSTALACIÓN DE TORRE DE TELECOMUNICACIÓN","CERCA DE CICLÓN A 2.10M ALTO=33.00M.L.; PAREDES DE BLOQUES 4\"=2.10M²; CIMIENTOS DE BLOQUES 8\"=33.00M²; LOSAS DE HORM.=12.00M²; ESCALERAS DE METAL Y CIRCULAR=10.00M²","200102","6536.5","65.37"],
    [33,"NO APLICA","28/07/2026","ATC-651","PMA-535-2026  RDPM-11276","RONALD AVILA HERRERA","RÍOS EUCLIDES  /  DESARROLLOS COMERCIALES, S.A.","COMERCIAL","PACORA","CALLE JOSÉ MUÑOZ MENESES. PLAZA MAS, LOCAL 21","REMODELACIÓN DE LOCAL COMERCIAL N° 21 EN PLAZA MAS SANTA FÉ","ÁREA A INTERVENIR=59.00M²","460268","29500","295"],
    [34,"NO APLICA","29/07/2026","ATC-654","PMA-622-2025  RDPM-9759","VILLARREAL ABREGO LEISSA MARISA","TERASUR, S.A.","COMERCIAL","PACORA","PUEBLO NUEVO. CALLE PRINCIPAL","INSTALACIÓN DE TORRE DE TELECOMUNICACIÓN","CERCA DE CICLÓN A 2.10M ALTO=33.00M.L.; PAREDES DE BLOQUES 4\"=2.10M²; CIMIENTOS DE BLOQUES 8\"=33.00M²; LOSAS DE HORM.=12.00M²; ESCALERAS DE METAL Y CIRCULAR=10.00M²","3275","6536.5","65.37"],
    [35,"NO APLICA","29/07/2026","ATC-656","PMA-621-2025  RDPM-9758","VILLARREAL ABREGO LEISSA MARISA","TERASUR, S.A.","COMERCIAL","SAN MARTÍN","CARRIAZO. CALLE PRINCIPAL","INSTALACIÓN DE TORRE DE TELECOMUNICACIÓN SITIO TERA 29- CARRIAZO","CERCA DE CICLÓN A 2.10M ALTO=33.00M.L.; PAREDES DE BLOQUES 4\"=2.10M²; CIMIENTOS DE BLOQUES 8\"=33.00M²; LOSAS DE HORM.=12.00M²; ESCALERAS DE METAL Y CIRCULAR=10.00M²","238818","6536.5","65.37"],
    [36,"RLA-2883","29/07/2026","ATC-661","POD-136-2026  RDP-5947","ARIEL ANTONIO PARRA PINZÓN","SYDNEY TOWN CORPORATION","RESIDENCIA","PACORA","ALTOS DE AZUL. AVENIDA DE LOS POETAS","PROYECTO ALTOS DE AZUL SM6, URBANIZACIÓN TERRAZAS DE ZELEDONIA","ETAPA DE INFRAESTRUCTURA. SISTEMA SANITARIO=13091.125M³; SISTEMA PLUVIAL=13091.125M³; SISTEMA DE ACUEDUCTO=13091.125M³; SISTEMA ELÉCTRICO=40 POSTES; PLANTA DE TRATAMIENTO=72800GALS.; MUROS=958.358M²; CALLES Y ACERAS DE ASFALTO=13091.125M³","159329, 159330, 30140008, 30140007 y 455525","2426982.66","18384.91"],
    [37,"NO APLICA","30/07/2026","ATC-681","PMA-537-2026  RDPM-11300","MANUEL VELARDE CARDOZE","PETROLEOS DELTA, S.A.","COMERCIAL","PUEBLO NUEVO","AVENIDA FERNANDEZ DE CÓRDOBA. LOTE E-63","ADICIÓN DE CUARTO DE CONTEO A ESTACIÓN DE COMBUSTIBLE.","ÁREA A CONSTRUIR=12.50M²","26191","9375","93.75"],
    [38,"NO APLICA","30/07/2026","ATC-643","PMA-466-2026  RDPM-11238","CONSTRUCTORA CENTOLA, S.A.","ARCOS DORADOS PANAMÁ, S.A. / DESARROLLOS COMERCIALES, S.A.","COMERCIAL","JUAN DÍAZ","AVENIDA COSTANERA. AVENIDA GAUDI","REMODELACIÓN INTERNA DEL LOCAL MC' DONALD'S VERSALLES","ÁREA A INTERVENIR=176.92M²","395132","88460","884.6"],
    [39,"RLA-1223","30/07/2026","ATC-676","POB-62.2026  RDP-5816","ADMINISTRACIÓN & CONSTRUCCIÓN L2, S.A.","PETROLERA NACIONAL, S.A.","COMERCIAL","CHILIBRE","EL SITIO. VÍA BOYD ROOSVELT. LOTE 13","CONSTRUCCIÓN DE GALERA PARA INSUMOS DE ESTACIONES DE COMBUSTIBLE TERPEL CHILIBRE","ÁREA A CONSTRUIR=700.00M²","22243/458","315000","3150"],
    [40,"RLA-1342","31/07/2026","ATC-679","POC-87-2025  RDP-5385","ERIKA MAYTE BERGUIDO GIL","JORGE ELIECER RIVERA -  RODRÍGUEZ RODRÍGUEZ","COMERCIAL","ANCÓN","ALBROOK. AVENIDA DIÓGENES DE LA ROSA","COLEGIO SAINT MARY: CONSTRUCCIÓN DE PABELLÓN DE P.B. Y UN ALTO PARA USO ESCOLAR (4 LABORATORIOS) 2 EN EN P.B. Y 2 EN P.A.","ÁREA A CONSTRUIR=843.26M²","177568","632445","6655.56"],
    [41,"NO APLICA","31/07/2026","ATC-633","PMA-400-2026  RDPM-11133","AMJ CONSTRUCCIONES, S.A.","GOLDEN BUNS, S.A.","COMERCIAL","ANCÓN","C.C. ALTA PLAZA MALL. VÍA CENTENARIO","ADECUACIONES  SHAKE SHACK ALTAPLAZA, LOCALES N° 2-306 Y N° 2-307","ÁREA A INTERVENIR=209.00M²","3192014,  30192015","156750","1567.5"],
    [42,"NO APLICA","2026-03-08 00:00:00","ATC-648","PMA-90-2026  RDPM-10822","DALUVA PANAMÁ, S.A.","PALACE CORPORATION, .S.A.","EDIFICIO","SAN FRANCISCO","PUNTA PACÍFICA. CALLE HELIODORO PATIÑO","ADECUACIÓN DE APARTAMENTO UNIDAD 45 EN PISO 44 EN P.H. OCEAN FRONT","ÁREA A INTERVENIR=496.83M²","30366989","124207.5","1242.08"],
    [43,"NO APLICA","2026-04-08 00:00:00","ATC-678","PMA-562-2026  RDPM-11304","ERIC ARIEL ARANGO ROSAS","SARTON PANAMÁ S.A.VIVIR FRENTE AL MAR, S.A.","COMERCIAL","DON BOSCO","URBANIZACIÓN PARQUE INDUSTRIAL. CALLE BOULEVARD ZONA 01 Y CALLE PRIMERA","ZONA UNO TERMINAL INDUSTRIAL SOUTHPARK WAREHOUSE REMODELACIÓN INTERIOR DE GALERA EXISTENTE   IKEA PANAMA GALERA 01, 02, 03, 04 Y 05","ÁREA A INTERVENIR=6303.26M²","30349003 @ 30349007","2836467","20432.34"],
    [44,"RLA-I-123","2026-04-08 00:00:00","ATC-611","POA-115-2026  RDP-5916","ARIEL JUNIER PALACIO DE ARCE","GRUPO PATINO, S.A.","COMERCIAL","BELLA VISTA","ENTRE CALLE 59 ESTE Y 60 ESTE. LOTE: 5-B","CAMPAMENTO TEMPORAL GRUPO PATIÑO","CONSISTE EN :OFICINAS, VESTIDORES Y ÁREA DE ALMACENAMIENTO. ÁREA A CONSTRUIR=181.36M²","36347/182","81612","816.12"],
    [45,"RLA-1175","2026-05-08 00:00:00","ATC-667","PO-HAD-36-2024  RDP-5920","CONSTRUCTORA MONTECARLO, S.A.","RESIDENCIAL MONTEMAR, S.A.","RESIDENCIA","ERNESTO CÓRDOBA CAMPOS","URBANIZACIÓN GREEN CITY. CALLE BOULEVARD EDMUNDO ESSES","CONSTRUCCIÓN DE CASAS MODELO B - SOLE (23U.), LOTES No.76@96, 108 Y 109 EN URB. GREEN CITY .PH AURA","ÁREA A CONSTRUIR/UNIDAD=182.40M²","30512736,  30457109","2758896","20044.48"],
    [46,"NO APLICA","2026-06-08 00:00:00","ATC-680","PMA-514-2026  RDPM-11252","IVÁN JESÚS DELGADO NÚÑEZ","BANCO ALIADOS, S.A.","EDIFICIO","SAN FRANCISCO","PUNTA PAITILLA. CALLE ELIODORO PATIÑO","REFORMAS INTERIORES DE PENTHOUSE 47A PISO 4600 EN P.H. OCEAN FRONT","ÁREA A INTERVENIR=679.23M²","30366991","169807.5","1698.08"],
    [47,"NO APLICA","2026-06-08 00:00:00","ATC-687","PMA-510-2026  RDPM-11249","D`MANAGEMENT GROUP, S.A.","PRICESMART PANAMA, S.A.","COMERCIAL","BELLA VISTA","C.C. VÍA ESPAÑA Y VÍA BRASIL","CONSTRUCCIÓN DE PAVIMENTO PRICESMART VÍA BRASIL.","AREÁ A CONSTRUIR= 2106.42M²","330643","84256.8","842.57"],
    [48,"NO APLICA","2026-06-08 00:00:00","ATC-619","PMA-425-2026  RDPM-11159","PITTI GONZÁLEZ ADALBERTO","IGLESIA DE JESUCRISTO DE LOS SANTO DE LOS ÚLTIMOS DÍAS","COMERCIAL","ALCALDE DÍAZ","ENTRE CALLE 2A Y NICOLE GARAY","REMODELACIÓN EN CAPILLA, OFICINAS ADMINISTRATIVAS Y AULAS DE LA IGLESIA DE JESUCRITO DE LOS SANTOS DE LOS ÚLTIMOS DÍAS:","CAMBIO DE CUBIERTA DE TECHO. A=766.87M²; REEMPLAZO DE CIELORASO INTERIOR Y EXTERIOR. A=766.87M²","68353","19171.75","191.72"],
    [49,"RLA-I-268","2026-07-08 00:00:00","ATC-640","POC-132-2026  RDP-5942","ERICK ALBERTO ZAPATA APARICIO","ALBROOK BUSINESS PARK, S.A.","COMERCIAL","ANCÓN","ALBROOK. CALLE RUBEN DARIO","PROYECTO CLUB DEPORTIVO DE GOLF EN ALBROOK, ANCÓN","ÁREA CERRADA DEL CLUB=544.06M²; ÁREA DE ESTACIONAMIENTOS=1640.00M² USO DE ACERA : 8.88M2 X 3 MESES","180808","436030","4626.7"],
    [50,"NO APLICA","2026-07-08 00:00:00","ATC-649","PMA-479-2026  RDPM-11217","DALUVA PANAMÁ, S.A","PAPAGALOS LAND CORP.","EDIFICIO","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB. CORREDOR SUR","REMODELACIÓN DE APARTAMENTO N° 500 B NIVEL 500 EN P.H. THE POLE, RESIDENCIAL SANTA MARÍA.","ÁREA A INTERVENIR=487.75M²","30368364","121937.5","1219.38"],
    [51,"RLA-316","2026-07-08 00:00:00","ATC-638","POC-128-2026  RDP-5936","ERICK ALBERTO ZAPATA APARICIO","PROMOTORA CASA EXPRESS, S.A.","COMERCIAL","PARQUE LEFEVRE","PARQUE LEFEVRE CENTRO. CALLE U","DISTRIBUIDORA DE PRODUCTOS SECOS EN P.B Y APARTAMENTOS EN PLANTA ALTA  + ESTACIONAMIENTOS.","ÁREA A CONSTRUIR DE APARTAMENTOS=102.74M²; ÁREA A CONSTRUIR DE LOCAL COMERCIAL=424.00M²  USO DE ACERA 7.20 M2 X 3 MESES","27255","263370","2849.7"],
    [52,"NO APLICA","2026-07-08 00:00:00","ATC-693","PMA-580-2026  RDPM-11321","OSCAR TEODORO FUENTES SALCEDO","GRUPO REINOSO FLORES S.AMOHE CORP. S.A.","COMERCIAL","DON BOSCO","URBANIZACIÓN VERSALLES. AVENIDA BARCELONA Y AVENIDA MIAMI","CANTABRIA SHOPS REMODELACIÓN A LOCAL N° 8 \"RESTAURANTE BOCAO RESERVADO","ÁREA A INTERVENIR=59.71M²","30489101","44782.5","447.83"],
    [53,"NO APLICA","2026-08-08 00:00:00","ATC-342","PMA-1501-2025  RDPM-10633","DELUXE CONSTRUCTION, S.A.  /  DELUXE CONSTRUCTION","GLOBAL FINANCIAL FUNDS SORP.","EDIFICIO","BELLA VISTA","EL CANGREJO. CALLE 45 ESTE","INSTALACIÓN DE ESTRUCTURA TEMPORAL PARA APARTAMENTO MODELO DE LA SEGUNDA FASE DE PH COSTANERA TORRE 200","ÁREA A CONSTRUIR=166.60M²","30393570","83300","833"],
    [54,"NO APLICA","2026-10-08 00:00:00","ATC-692","PMA-541-2026  RDPM-11281","CONSTRUCTORA DOCABO, S.A.","GUAPA COCINA, S.A.  /  COMMONS MARKET, S.A.","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE. CALLE PASEO DE MAR","REMODELACIÓN DE LOCAL \"GUAPA COCINA RESTAURANTE\", LOCAL N° A-4 EN PH UPPER EAST TOWER, COSTA DEL ESTE","ÁREA A INTERVENIR=165.00M²","30390419","123750","1237.5"],
    [55,"NO APLICA","2026-10-08 00:00:00","ATC-697","PMA-574-2026  RDPM-11317","ERIKA ESTHER MOSQUERA DE BETHANCOURT","EMPRESAS MELO, S.A.  /  JIA ALBROOK, S.A.","COMERCIAL","ANCÓN","C.C. ALBROOK MALL. AVENIDA MARGINAL Y CORREDOR NORTE","REMODELACIÓN A RESTAURANTE PIO PIO 34 EN C.C. ALBROOK MALL, LOCAL N° E-9","ÁREA A INTERVENIR=12.92M²","59741","6460","64.6"],
    [56,"NO APLICA","2026-10-08 00:00:00","ATC-655","PMA-488-2026  RDPM-11226","ERIKA ESTHER MOSQUERA DE BETHANCOURT","EMPRESAS MELO, S.A.  /  MERCEDES ELENA SOLE ICAZA DE MC GOWEN","COMERCIAL","PUEBLO NUEVO","CALLE 12 DE OCTUBRE","REMODELACIÓN A PIO PIO 49, LOCAL N° C-4 EN P.H. EDIFICIO 11 DE OCTUBRE EN AVE. 12 DE OCTUBRE","ÁREA A INTERVENIR=106.20M²","6152","53100","531"],
    [57,"RLA-I-331","2026-11-08 00:00:00","ATC-671","POA-146-2026  RDP-5968","VERTICAL PANAMÁ, S.A.","MORELLO ENTERPRISE INC.","RESIDENCIA","JUAN DÍAZ","PH. SM ISLAND ESTATES. CALLE MANUEL MARÍA ICAZA","CONSTRUCCIÓN DE RESIDENCIA  UNIFAMILIAR ALFARO -GALINDO  , LOTE N° 12 EN P.H. SM ISLAND ESTATES","ETAPA DE ESTRUCTURA CONSISTE EN: MOVIMIENTO DE TIERRA 2555.78 M3 , CABEZALES 44.46 M3, PILOTES 65.67 M3, VIGAS SISMICAS 17.86 M3, TANQUE DE AGUA Y FOSOS 30.21 M3, LOSA SOBRE SUELO 460.85 M2, RAMPA SOBRE SUELO NATURAL 77.20 M2, MURO DE RETENCIÓN 115.31 M3, LOSAS POSTENSADAS 1100.31M2, COLUMNAS 43.76M3, SHEAR WALL 57.09 M3, ESCALERAS 22.25 M3, MUROS DE MACETEROS 5.72 M3, VIGAS DE CONCRETO 16.74 M3, PISCINA 37.17 M3, ESTRUCTURA METÁLICA DE TECHO 499.01 M2","430975","324037.63","3240.38"],
    [58,"RLA-2675","2026-12-08 00:00:00","ATC-703","POC-119-2026  RDP-5921","GLORIA ARAUZ BATISTA","INCE SHIRLEY ELADIO ENRIQUE MIRTA MARIELA INCE SHIRLEY","RESIDENCIA","SAN FRANCISCO","CARRASQUILLA. VÍA ESPAÑA","3 UNIDADES DE APARTAMENTOS EN PLANTA BAJA","ÁREA A REFORMAR=177.84M²","62160","160056","1600.56"],
    [59,"NO APLICA","2026-12-08 00:00:00","ATC-653","PMA-501-2026  RDPM-11240","ERIKA ESTHER MOSQUERA DE BETHANCOURT","EMPRESAS MELO, S.A.","COMERCIAL","LAS GARZAS","BARRIADA P.H. MONTEMADERO II.  CARRETERA PANAMERICANA","PH PASEO MONTEMADERO REMODELACIÓN A LOCAL PETS & GARDEN MELO EN URBANIZACIÓN LA FLORESTA, LOCAL L.M.1 NIVEL 000","ÁREA A INTERVENIR=192.44M²","30461410","96220","962.2"],
    [60,"RLA-1176","2026-12-08 00:00:00","ATC-668","PO-HAD-37-2024  RDP-5922","CONSTRUCTORA MONTECARLO, S.A.","RESIDENCIAL MONTEMAR, S.A.","RESIDENCIA","ERNESTO CÓRDOBA CAMPOS","URBANIZACIÓN GREEN CITY. CALLE EDMOND ESSES. LOTES: 103 @ 107","URB. GEEN CITY. PH AURA ARIA, MODELO C","CONSTRUCCIÓN DE CASAS MODELO C - ARIA (5U.), LOTES 103@107 URB. GEEN CITY. ÁREA A CONSTRUIR/UNIDAD=211.00M²","30512736  Y  30457109","949500","10618.75"],
    [61,"RLA-I-62","2026-12-08 00:00:00","ATC-699","POA-131-2026   RDP-5941","CLAUDIA MERCEDES HERRRERA GALLARDO","PROMOTORA LA RIBERA, S.A.","EDIFICIO","JUAN DÍAZ","CIUDAD RADIAL. CALLE 133 ESTE PH CONCRETE","PROYECTO P.H. CONCRETE: CONST. DE EDIFICIO RESIDENCIAL DE 5 NIVELES DE APTOS.","ÁREA A CONSTRUIR=4000.00M²","37303 /  330","2000000","16250"],
    [62,"RLA-I-54","2026-12-08 00:00:00","ATC-628","PO-HAC-169-2025  RDP-5894","DERIVADOS DEL PETROLEO, S.A.","IDEAL LIVING CORP.","RESIDENCIA","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB. CALLE BOULEVARD NORTE, CALLE E","PH EMILY EDIFICIO RESIDENCIAL SANTA MARÍA NORTE LOTE 06: ETAPA ESTRUCTURA.","LOSAS ESTRUCTURALES POSTENSADAS=22570M²; VIGAS Y COLUMNAS DE HORM. 4135.00M³; PAVIMENTO DE HORM.=2385.00M²","277648","5643150","34465.75"],
    [63,"NO APLICA","13/08/2026","ATC-704","PMA-570-2026  RDPM-11312","JUAN PABLO GARCIA SAMANIEGO","COOPER DELGADO YURI JONES CANAL FIDUCIARIA, S.A. Y (C.T.),","EDIFICIO","BELLA VISTA","URBANIZACIÓN EL CARMEN. AVENIDA  5C NORTE. CALLE ELIDA DIEZ","REMODELACIÓN DE PH JARAR EN URB. EL CARMEN","ÁREA A INTERVENIR=451.63M²","63842,63843, 63844, 63845","225815","2258.15"],
    [64,"NO APLICA","13/08/2026","ATC-621","PMA-436-2026  RDPM-11170","MANUEL VELARDE CARDOZE","GRUPO MARCA SALUD, S.A.INMOBILIARIA CAVALIER, S.A.","COMERCIAL","ANCÓN","CENTENIAL. CALLE B","REFORMAS A LOCAL MEDICHECK EN P.H. CAMINOS DE CENTENNIAL","LOCAL No.4A. ÁREA A INTERVENIR=150.00M²","30246267","112500","1125"],
    [65,"NO APLICA","13/08/2026","ATC-700","PMA-327-2026  RDPM-11059","SANDRA ARABIA ACOSTA SAEZ","RAKELSE, S.A.  /  EL CHATEAU, S.A.","EDIFICIO","SAN FRANCISCO","PAITILLA. CALLE C","REMODELACIÓN DE ÁREA SOCIAL DEL P.H. OCEAN POINT","DEMOLICIÓN DE MOLDURAS=137.00M²; ÁREA CERRADA=41.04M²; REMODELACIÓN DE PISCINAS=110.63M²; BARANDA DE VIDRIO Y ALUMINIO=88.00M.L.; CONSTRUCCIÓN DE DECK=38.16M²; CONTRUCCIÓN DE ÁREA DE BBQ=65.22M²; REVESTIMIENTO DE PISO DE TERRAZA=149.07M²","30148267","107490.85","1074.91"],
    [66,"NO APLICA","13/08/2026","ATC-689","PMA-527-2026  RDPM-11267","GILBERTO RODRÍGUEZ REYES","P.H. CENTRO COMERCIAL LAS MAÑANITAS N-3","COMERCIAL","LAS MAÑANITAS","AVENIDA JOSÉ MARIÍA TORRES","INSTALACIÓN DE TECHO SOBRE ESTACIONAMIENTOS EXISTENTES EN P.H. COMERCIAL LAS MAÑANITAS.","ÁREA A INTERVENIR=1104.00M²","52507","82800","828"],
    [67,"RLA-1059","14/08/2026","ATC-683","HAPOB 246-2022 RDP-5953","ANDRES EDUARDO FIGUEROA LOPEZ","AVNER PERRY INVESTMENTS, S.A.","COMERCIAL","LAS MAÑANITAS","LAS MAÑANITAS","AMPLIACION DE GALERAS DE ALMACENAMIENTO \"GALERAS REFRIGERADAS GALORES MAÑANITAS\"","ÁREA A CONSTRUIR=1010.00M²","178465","454500","4545"],
    [68,"NO APLICA","14/08/2026","ATC-707","PMA 607-2026 RDPM-11348","COLPASAN, INC.","PRODUCTOS ALIMENTICIOS PASCUAL S.A. GOLD MILLS DE PANAMA, S.A ,","COMERCIAL","BETANIA","URBANIZACIÒN LOS ANGELES, CALLE HARRY HENO Y CALLE 64 OESTE","REFORMAS A LOCAL EXISTENTE GOLD MILLS, NUEVAS INSTALACIONES PARA PERSONAL EN BODEGA URB. LOS ANGELES - BETANIA","ÁREA A INTERVENIR=264.48M²","30427416, 30451539, 31537","119016","1190.16"],
    [69,"NO APLICA","14/08/2026","ATC-702","PMA 595-2026 RDPM-11338","RAMIREZ PEREZ ROBERTO MIGUEL","COOPERATIVA DE AHORRO Y CREDITO SAN ANTONIO R.L","EDIFICIO","CALIDONIA","CALIDONIA, AVE. CUBA Y CALLE 37","INSTALACIÒN DE SISTEMA HIDRONEUMATICO CON TANQUES DE ALMACENAMIENTO Y BOMBAS EN EDIFICIO SEDE DE CACSA, AVE. CUBA.","REMOCIÓN DE PARED DE BLOQUES=3.00M²; CONST. DE PAVIMENTO DE CONCRETO DE 0.20M ESP.=4.50M²; INST. DE TUBERÍAS DE PVC=2U.; INST. DE TANQUES DE AGUA (4U)=220.00 GAL./CU; INST. BOMBA SUMERGIBLE=1U.; INST. TANQUE PRESURIZADO=1U.; INST. TABLERO DE CONTROL.","11182","2900","29"],
    [70,"RLAB-44","14/08/2026","ATC-708","HAPOC 202-2025 RDP-6006","CONSTRUCTORA Y DESARROLLOS CIVILES PANAMA S A","GLENDOR FINANCE S. A.","COMERCIAL","BELLA VISTA","OBARRIO, AVE. RICARDO ARANGO, CALLE 53, 54","PROYECTO VERA PLAZA 2DO. NIVEL, INCLUYE 8 LOCALES COMERCIALES No.L19 @ L26","ÁREA CERRADA 1118.23 M2","26088","559115","5738.94"],
    [71,"NO APLICA","14/08/2026","ATC-642","PMA-423-2026 RDPM-11157","FABIAN OSCAR DEL ROSARIO RODRIGUEZ","CONFERENCIA EPISCOPAL PANAMEÑA (C.E.P.)","COMERCIAL","ANCÓN","CLAYTON, CALLE -18; LOTE: CL-18","ADECUACIONES A CENTRO ESPIRITUAL NUESTRA SEÑORA DE FATIMA , CONFERENCIA EPISCOPALPANAMEÑA","ÁREA QUE CONSISTE EN : ADICIÓN DE CAMINO DE PIEDRA, ADICIÓN DE CAFETERIA Y OFICINA 30 M2","240267","10800","108"],
    [72,"NO APLICA","17/08/2026","ATC-717","PMA 502-2026 RDPM-1124","VILLA MARTINEZ MAURICIO AUGUSTO","TRANS OCEAN NETWORK CORP","COMERCIAL","CALIDONIA","AVE OMAR TORRIJOS, AVE 3 DE NOVIEMBRE, AVE MEXICO, CL 28 ESTE Y CINTA COSTERA","INSTALACIÓN DE INFRAESTRUCTURA PARA TELECOMUNICACIONES FIBRA OPTICA SOTERRADA","VIGA DUCTO=2200M.L.; PAVIMENTO DE HORM DE 0.25M ESP.=320.00M²; CÁMARAS DE INSPECCION=14U.; PAVIMENTO DE HORM. DE 0.10M ESP.=1300.00M²","S/N","411900","4119"],
    [73,"RLA-1718","17/08/2026","ATC-616","HAPOD 158-2024 RDP-5754","CARLOS ALBERTO CEDEÑO ABREGO","ASSETS TRUST & CORPORATE SERVICES INC. DESARROLLADORES DE PROYECTOS Y URBANIZACIONES S.A.,","RESIDENCIA","PACORA","CALLE 1B DESDE ENTRADA HASTA LA CL. 5B, 6B, 7B HASTA LA INTERSECCIÓN CON CALLE 8B)","PROYECTO VILLAS DEL ESTE - ETAPA 1: INFRAESTRUCTURA (CALLES 1B DESDE ENTRADA HASTA LA CL. 5B, 6B, 7B HASTA LA INTERSECCION CON CALLE 8B)","SISTEMA SANITARIO: TUBERÍAS 6\"=720.68M.L.; TUBERÍAS 8\"=133.94M.L; CÁMARAS DE INSPECCIÓN=16U. SISTEMA DE ACUEDUCTO: TUBERÍA 4\"=958.04M.L.; TUBERÍA 6\"=92.44M.L. SISTEMA PLUVIAL: TUBERÍAS DE 24\"=62.06M.L.; TUBERÍAS DE 30\"=33.52M.L.; TRAGANTES=8U. SISTEMA VIAL: PAVIMENTO DE 0.20M ESP.=6886.06M²; PAVIMENTO DE 0.15M ESP.=3284.31M²; CAPA BASE=7564.09M²; CORDÓN CUNETA=289.43M.L.; CUNETA ABIERTA=1591.20M.L.; ÁREA VERDE=3946.08M² SISTEMA ELÉCTRICO: POSTES DE ELECTRICIDAD=24U.","31210","675539.6","7194.25"],
    [74,"RLA-883","18/08/2026","ATC-694","POB-15-2026 RDP-5730","ALBERTO CHU LIAO","TIANREN WU","COMERCIAL","JUAN DÍAZ","VILLA VENUS 1, AVE. JOSÉ AGUSTÍN ARANGO","CONSTRUCCIÓN DE BODEGA DE ACOPIO","ÁREA A CONSTRUIR=1012.37M²; MOV. DE TIERRA/RELLENO=580.00M³; MUROS DE HORM. ARMADO=480.00M²; CUARTO ELÉCTRICO=2.00; TINAQUERA= USO DE ACERA ÁREA 18.77M2 X 4 MESES","45899","531806.5","6148.78"],
    [75,"NO APLICA","18/08/2026","ATC-713","PMA 569-2026 RDPM-11311","JORGE ENRIQUE AMADOR CERON","PRISCILLA JEANNETTE BELLO CUANEDUARDO ANTONIO DOMINGUEZ OSORIO","RESIDENCIA","JUAN DÍAZ","COSTA DEL ESTE- AVE. COSTA D E LAS PERLAS; LOTE: 27","REMODELACIÓN A RESIDENCIA UNIFAMILIAR \"DOMINGUEZ BELLO\" EN COSTA DEL ESTE, COSTA DE LAS PERLAS, CASA No.27.","ÁREA A CONSTRUIR=460.00M²","63392","230000","2300"],
    [76,"NO APLICA","18/08/2026","ATC-690","PMA 367-2026 RDPM-11098","PORTUGAL BERNAL ERICK OSCAR","PRICESMART PANAMA, S.A.","COMERCIAL","JUAN DÍAZ","CIUDAD RADIAÑ- CALLE METROPARK, BOULEVARD SUROESTE","REMODELACIÒN DE ESTACIONAMIENTOS EXISTENTES PRICESMART METRO PARK: INCLUYE 16 ESTACIONAMIENTOS NUEVOS TECHADOS Y REUBICACION DE 22 ESTACIONAMIENTOS EXISTENTES","REUBICACION DE CERCA PERIMETRAL=56.52M.L.; VACIADO DE LOSA DE CONCRETO=300.00M²; EXTENSION DE TECHO=80.00M²","131913","17239","172.39"],
    [77,"NO APLICA","18/08/2026","ATC-714","PMA 613-2026 RDPM-11354","JAMES ALEXANDER FLORES RUIZ","PANAFOTO DUTY FREE, S.A.","COMERCIAL","TOCUMEN","AEROPUERTO INTERNACIONAL DE TOCUMEN, VÌA TOCUMEN","REMODELACIÒN LOCAL DUTTY FREE PANAFOTO EN AEROPUERTO INTERNACIONAL DE TOCUMEN, TERMINAL 1 C2-35","ÁREA A INTERVENIR=64.06M²","48857","48045","480.45"],
    [78,"RLA-2592","19/08/2026","ATC-600","POD-98-2026 RDP-5890","DEPONO,S.A","PORTA NORTE INVESTMENT S.A.","RESIDENCIA","ERNESTO CÓRDOBA CAMPOS","URBANIZACIÒN PH PORTA NORTE","PROYECTO CIUDAD PORTA NORTE: ETAPA MOVIMIENTO DE TIERRA DE FASE 2.","CORTE=56000.00M³; RELLENO=37300.00M³","31044 y 27860","587800","6097.5"],
    [79,"RLA-2592","19/08/2026","ATC-706","PME-256-2026 RDPM-10985","PINTURAS GARANTIZADAS S A","INSTITUTO PANAMEÑO DE DEPORTES","COMERCIAL","ANCÓN","LLANOS DE CURUNDÙ, CALLE TOMAS GABRIEL DUQUE","REMODELACIÒN DE COMPLEJO DEPORTIVO DE TENIS FRED MADURO","CUBIERTA LIVIANA TIPO LONA=376.86; INST. DE LUMINARIAS=18U.; IMPERMEABILIZACIÓN DE GRADERIAS=3387.4M²; COLOCACIÓN DE ADOQUINES=800.00M²; CERCA DE CICLÓN DE 2.10M ALTO=8337M.L.","221060","320260","3202.6"],
    [80,"RLA-I-376","19/08/2026","ATC-711","POB 154-2026 RDP-598","PMF MANAGEMENT CORP","INVERSIONES TITOPLITO, S.A.","COMERCIAL","LAS MAÑANITAS","LAS MAÑANITAS, LOTES: 2 Y 3","PROYECTO CENTRO DE DISTRIBUCION AGENCIAS MOTTA: ETAPA MOVIMIENTO DE TIERRA","CORTE=19044.10M³; RELLENO=4317.64M³","446249 y 446250","149692.49","1496.92"],
    [81,"RLA-2339","19/08/2026","ATC-662","HAPOC 161-2025 RDP-5897","BOSQUES DE SANTA MARÍA, S.A","IDEAL LIVING CORP","EDIFICIO","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB, AVE. CIRCUNVALACION NORTE; LTE: MD-3","PH BOSQUES DE SANTA MARÍA, PILOTES Y ESTRUCTURA CONSISTE EN : PILOTES HINCADOS DE CASA CLUB, PISCINAS, ESTRUCTURA DE CASA CLUB, PISCINAS, TORRES T1 Y T2","VIGAS Y COLUMNAS DE HORM. (FORMALETAS DE HORM. Y ACERO)=52011.47M³","277646","13002867.5","71264.34"],
    [82,"NO APLICA","19/08/2026","ATC-720","PMA 604-2026 RDPM-11345","VIVO CONSTRUCTION, S.A. Y ABREVIADO VICONSA","YANHONG LIANG","COMERCIAL","24 DE DICIEMBRE","24 DE DICIEMBRE, CARRETERA PANAMERICANA","REMODELACIÓN DE DRAGON CHINO LA 25 PLAZA, LOCALES No.B1, B36 Y B37","ÁREA A INTERVENIR=259.84M²","30444894","194880","1948.8"],
    [83,"NO APLICA","20/08/2026","ATC-725","PMA 597-2026 RDPM-11340","ERIKA ESTHER MOSQUERA DE BETHANCOURT","MR. AREPA CENTRO, S.A.PROMOTORA LA 25, S.A.,","COMERCIAL","24 DE DICIEMBRE","NUEVO TOCUMEN, VÌA PANAMERICANA","REMODELACIÒN LOCAL COMERCIAL MR AREPAS, LOCAL No.A-26 EN LA 25 PLAZA","ÁREA A INTERVENIR=47.81M²","30444894","23905","239.05"],
    [84,"NO APLICA","20/08/2026","ATC-659","PMA 578-2025 RDPM-9714","VILLARREAL ABREGO LEISSA MARISA","TERASUR, S.A","COMERCIAL","CAIMITILLO","CAIMITILLO, CALLE PRINCIPAL","INSTALACIÒN PARA TORRE DE TELECOMUNICACIÒN CELULAR TERA-35 NUEVO CAIMITILLO","LOSAS ESTRUCTURALES DE HORM. DE 0.20M ESP.=1.00; CAMBIO DE LAMPARA=1U.; LOSAS ESTRUCTURALES DE HORM. DE 0.15M ESP.=64.00M²; PAREDES DE BLOQUES 4\"=2.10M²","3240","11447.5","114.48"],
    [85,"NO APLICA","20/08/2026","ATC-712","PMA-452-2026 RDPM-11183","TORECHA INTERNATIONAL INC","PRESTIGE RESTAURANTS PANAMA, S.A.","COMERCIAL","BELLA VISTA","OBARRIO, ENTRE LA ESQUINA 58 Y AVE. RICARGO ARANGO LOCAL 4 Y 5 (FRANQUICIA DE RESTAURANTE)","REMODELACIÓN A LOCAL COMERCIAL N° 4 Y N° 5 PARA FRANQUICIA DE PIZZA HUT EN PLAZA COMERCIAL ESQUINA 58.","ÁREA A INTERVENIR=199.19M²","16195 / 30052","149392.5","1493.93"],
    [86,"RLA-1845","20/08/2026","ATC-686","POC 150-2026 RDP-5972","EDWIN DE JESUS DELGADO BARRIOS","GUILLERMO SERRANO COFFREESTACION TOCUMEN STAR, S.A.","COMERCIAL","TOCUMEN","AEROPUERTO INTERNACIONAL DE TOCUMEN, VÌA TOCUMEN; LOTE: 1","ESTACIÒN DE GASOLINA Y LOCALES COMERCIALES","CIMIENTOS BLOQUES 6\"=136.00M²; LOSAS DE HORM.=800.00M²; FASCIAS=87.26M²; LOSAS POSTENSADAS=250.00M²; TECHOS=450.00M²; VENTANAS VIDRIO Y ALUM.=57.00M²; DESAGUES PLUVIALES=64.00M.L.; KIOSKO DE BLOQUES=3.50M²; PUERTAS DE 3X7=17U.; VIGAS Y COLUMNAS DE HORM.=14.67M³; CUARTO ELECTRICO=10.80M²; TANQUE SOTERRADO=113.55GALS.; SURTIDORAS PARA GASOLINA=3U.; TINAQUERA=4.50M²; REPELLO=950.00M²; LAMPARAS=30U.; INODOROS=5U.; LAVAMANOS=5U.","206746/206746","245067.5","2690.68"],
    [87,"NO APLICA","21/08/2026","ATC-688","PMA 323-2026 RDPM-11055","ZAKIR AHMED BHANA BHANA","PROMOCIONES BELLA VISTA, S.A.","EDIFICIO","BELLA VISTA","BELLA VISTA, AVE. JUSTO AROSEMENA","REEMPLAZO DE VENTANAS EN FACHADA DE EDIFICIO EXISTENTE EN NIVEL 400, SECTOR LA CRESTA","ÁREA A INTERVENIR=270.00M²","21868","40500","405"],
    [88,"NO APLICA","21/08/2026","ATC-615","PMA 458-2026 RDPM-11190","ERIKA ESTHER MOSQUERA DE BETHANCOURT","EMPRESAS MELO, S.A","COMERCIAL","24 DE DICIEMBRE","24 DICIEMBRE- AVE, JOSSE AGUSTIN ARANGO","RECONSTRUCCIÒN DE TALUD EN CERCA DE MELO-CABUYA","MURO DE CICLOPEO Y GAVIONES=100M²; MUROS DE MATACAN=100M²; MUROS DE PIEDRAS LABRADAS O LAJAS=100M253; CERCA DE CICLON @2.10M ALTO=20M.L","49380","20060","200.6"],
    [89,"RLA-2884","22/08/2026","ATC-719","POD 159-2026 RDP-6000","SANTIAGO GERARDO RODRÍGUEZ LÓPEZ","SYDNEY TOWN CORPORATION","RESIDENCIA","PACORA","CIUDAD SANTA DE, AVENIDA DE LOS ALTOS; LOTES: No.1 @ 22 , No.1 @ 22","PROYECTO ALTOS DE AZUL SM6 / TERRAZAS DE ZELEDONIA: CONSTRUCCIÓN DE 44 CASAS TIPO A, LOTES N° 1 @ 22 EN CALLE 1 Y LOTES No.1 @ 22 EN CALLE 2","ÁREA A CONSTRUIR POR UNIDAD=51.77M²","159329, 159330, 30140008, 30140007 y 455525","820036.8","9000.46"],
    [90,"RLA-2769","24/08/2026","ATC-626","POD-89-2026   RDP-5872","JOSÉ ARSEL JOSÉ JORDAN BEITIA","PORTA NORTE INVESTMENT S.A.","EDIFICIO","ERNESTO CÓRDOBA CAMPOS","P.H. PORTA NORTE. VÍA PANAMÁ NORTES","PROYECTO PORTAVITA: ETAPA DE MOVIMIENTO DE TIERRA E INFRAESTRUCTURA","SISTEMA ELÉCTRICO=40U.; MUROS=566.67M²; SISTEMA SANITARIO=6589.77M.L.; SISTEMA PLUVIAL=6589.77M.L.; SISTEMA ACUEDUCTO=6589.77M.L.; CALLES Y ACERAS DE HORM. DE 0.5M=6589.77M²; MOV. DE TIERRA CORTE Y RELLENO=6799.74M³","30254905, 30329811, 31919, 30388048, 30329807","917745.51","10221.82"],
    [91,"RLA-2758","24/08/2026","ATC-715","POB-161-2026  RDP-6003","OMAR HILDEBRANDO BATISTA HERRERA","JIAN RONG MO HE","COMERCIAL","PUEBLO NUEVO","AVENIDA FERNÁNDEZ DE CÓRDOBA Y CALLE 77 A. OESTE. LOTE A","BODEGA DE ACOPIO, LOTE A.","ÁREA A CONSTRUIR=652.8M²","20958/1","293760","3225.6"],
    [92,"NO APLICA","24/08/2026","ATC-736","PMA-627-2026  RDPM-11370","LINETH DEL CARMEN DELGADO GARCIA","BANCO GENERAL","COMERCIAL","JUAN DÍAZ","URBANIZACIÓN SANTA CLARA. AVENIDA JOSÉ AGUSTÍN ARANGO","REMODELACIÓN SUCURSAL DE BANCO GENERAL - PLAZA CAROLINA","ÁREA A INTERVENIR=310.81M²","107392","233107.5","2331.08"],
    [93,"RLA-2205","25/08/2026","ATC-723","POD-96-2026  RDP-5886","OLIMPIAKOS CONSTRUCTION, S.A. (OCSA)","COLINAS LAND COMPANY, S.A.","RESIDENCIA","ERNESTO CÓRDOBA CAMPOS","GONZALILLO. AVENIDA      DEL PARQUE. LOTES: N° A-01 @ A-28 Y N° A-178 @ A-204","CONSTRUCCIÓN DE 55 CASAS MODELO SERENA EN URB. COLINAS DEL NORTE, LOTES N° A-01 @ A-28 Y N° A-178 @ A-204","ÁREA A CONSTRUIR POR UNIDAD=77.96M²","291779, 291788, 291792","1972388","16111.94"],
    [94,"RLA-2891","25/08/2026","ATC-684","POA-153-2026  RDP-5981","DELGADO RUDA ULISES","MIRNA VANESSA CASIRA HEART","RESIDENCIA","BETANIA","VILLA SE LAS FUENTES. CALLE 23 E, NORTE O CALLE VALENCIA. LOTE: B-19","CONSTRUCCIÓN DE APARTAMENTO - ESTUDIO EN RESIDENCIA EXITENTE NIVEL 200, URB. VILLAS DE LAS FUENTES.","ÁREA CERRADA A CONSTRUIR=58.75M².  ÁREA SEMI-ABIERTA=57.94M²","62348/306","14687.5","146.88"],
    [95,"RLAB-320","25/08/2026","ATC-741","POC-126-2026  RDP-5933","BELLA VISTA DEVELOPMENT CORP.","ISAKALI CORPORATION","EDIFICIO","CALIDONIA","LA EXPOSICIÓN. CALLE 40. AVENIDA MEXICO","PROYECTO VIPE: ETAPA DE FUNDACIONES.","VIGAS Y COLUMNAS DE HORM. INCLUYE FORMALETAS Y ACERO=1256.00M². MOVIMIENTO DE TIERRA 606.94 M3","12807, 12822, 13238","317945.11","3179.45"],
    [96,"RLA-I-149","25/08/2026","ATC-709","POA-92-2026  RDP-5881","FLORENTINO ALBERTO VILLAR GONZÁLEZ","ALAIN ALBENIS CEDEÑO NAVARRO","RESIDENCIA","LAS GARZAS","URBANIZACIÓN LAS GARZAS","CONSTRUCCIÓN DE VIVIENDA UNIFAMILIAR EN URB. LAS GARZAS, PACORA","ÁREA A CONSTRUIR=303.43M²","30497313,   8716","273087","2730.87"],
    [97,"NO APLICA","25/08/2026","ATC-696","PMA-519-2026  RDPM-11257","CAMBEFORT & COMPAÑIA, S.A.","LIBERTY BURGERS, S.A.","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE. AVENIDA LA ROTONDA","PROYECTO ANTIBURGER C.D.E.: REMODELACIÓN INTERNA DE LOCAL COMERCIAL EN COMPLEJO BUSINESS PARK, URB. COSTA DEL ESTE","ÁREA A INTERVENIR=194.06M²","243197","97030","970.3"],
    [98,"529-18","25/08/2026","ATC-675","POE-221-19  RDP-2597","PAULETTE MIREYA FERNÁNDEZ PINO","MUNICIPIO DE PANAMÁ ESTACIONAMIENTOS DYNAMIC 5, S.A.","INSTITUCIONAL","SANTA ANA","SOBRE AVENIDA 3 DE NOVIEMBRE Y CALLE 22A OESTE","PROYECTO ESTACIONAMIENTOS SUBTERRANEOS, MERCADO PERIFÉRICO Y DE ARTESANIAS, PLAZA Y LOCALES COMERCIALES","ETAPA DE MOVIMIENTO DE TIERRA, ZAPATAS, MURO DE CONTENCIÓN, CORTE Y RELLENO. MOVIMIENTO DE TIERRA - RELLENO=293.00M³; MOVIMIENTO DE TIERRA - CORTE=3707.00M³; MURO DE HORM.=2234.80M² RESIDENTE DE OBRA: PAULETTE FERNÁNDEZ","31084","547517.5","5593.97"],
    [99,"RLA-1875","25/08/2026","ATC-691","PO-HAC-126-2025  RDP-5631","GRUPO DE INGENIEROS CONTRATISTAS, S.A","KYTE BY LIVING S.A.","EDIFICIO","BELLA VISTA","OBARRIO. CALLE STE. LOTE E","PROYECTO KYTE BY LIVING EDIFICIO DE APARTAMENTOS.","ÁREA A CONSTRUIR= 8179.58M²","29665","4089790","26698.95"],
    [100,"NO APLICA","26/08/2026","ATC-701","PMA-582-2026  RDPM-11324","GRUPO COSTA SUR, S.A. (GRUCOSUR)","ESTACIÓN CIENTIFICA COIBA- AIP FUNDACIÓN CIUDAD DEL SABER","COMERCIAL","ANCÓN","CIUDAD DEL SABER. CALLE OVIDIO SALDAÑA","ESTACIÓN CIENTIFICA COIBA AIP EDIFICIO 231 LOCAL B CIUDAD DEL SABER-CLAYTON ,REMODELACIÓN DE OFICINAS PARA LABORATORIO","ÁREA A INTERVENIR=255.00M²","178392","191250","1912.5"],
    [101,"RLA-1-313","26/08/2026","ATC-738","POE-177-2026  RDP-6040","CONSTRUCTION MANAGEMENT GROUP, INC","MINISTERIO DE DESARROLLO AGROPECUARIO","INSTITUCIONAL","DON BOSCO","DON BOSCO 2. VÍA COSTA DEL SUR","HOSPITAL VETERINARIO PARA MASCOTAS: ETAPA DE MOVIMIENTO DE TIERRA, FUNDACIONES Y ESTRUCTURA.","MOVIMIENTO DE TIERRA - CORTE=3200.00M³; MOVIMIENTO DE TIERRA - RELLENO=7587.00M³; FUNDACIONES Y ESTRUCTURA= 536.10M²","304977268//2726","200347","2003.47"],
    [102,"NO APLICA","26/08/2026","ATC-705","PMA-598-2026  RDPM-11341","AMJ CONSTRUCCIONES, S.A.","SILABA MOTORS, S.A.  BRIGHSTAR MANAGEMENT CORP.","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE. AVENIDA CINCUENTENARIO","REMODELACIÓN DE LOCAL \"MAZDA COSTA DEL ESTE\". DREAM PLAZA NIVEL 000 LOCALES No. 2, No. 3, No. 4, No. 7","ÁREA A INTERVENIR=538.29M²","30273458, 30273459, 30273461, 30273463/","403717.5","4037.18"],
    [103,"NO APLICA","27/08/2026","ATC-740","PMA-427-2026  RDPM-11161","LUIS ANTONIO JIMÉNEZ SORACA","FUNDACIÓN CIUDAD DEL SABER","EDIFICIO","ANCÓN","CIUDAD DEL SABER. CALLE JORGE GIL","REFORMAS A BAÑOS EL PARQUE EN EDIFICIO N°369B CIUDAD DEL SABER ²","ÁREA A INTERVENIR=32.39M","178392","16195","161.95"],
    [104,"RLA-I-397","27/08/2026","ATC-730","POA-160-2026  RDP-6002","CENTROEQUIPOS, S.A.","ISLAND ESTATES 55, INC.","RESIDENCIA","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB. CALLE 3ERA. OESTE CON CALLE 3ERA. SUR. LOTE IE-55","CONSTRUCCIÓN DE VIVIENDA UNIFAMILIAR DE P.B. + 1 ALTO, LOTE No.55 EN SANTA MARÍA GOLF & COUNTRY CLUB, ISLAND ESTATES.","ÁREA A CONSTRUIR=705.40M²","431020","640937.5","6761.72"],
    [105,"RLA-I-188","28/08/2026","ATC-727","POA-168-2026  RDP-6024","JUAN CARLOS RINCÓN MIRANDA","DESARROLLO DE VIVIENDAS SILVESTRE, S.A.","EDIFICIO","24 DE DICIEMBRE","NUEVO TOCUMEN. CALLE S/N. LOTE 2","PROYECTO P.H. SILVESTRE","CONSTRUCCIÓN DE ÁREA SOCIAL: CASA CLUB, GARITA, PISCINA Y GIMNASIO. ÁREA A CONSTRUIR=703.35M²","30434473","633015","6662.69"],
    [106,"RLA-2884","28/08/2026","ATC-728","POD-159-2026  RDP-6000","SANTIAGO GERARDO RODRÍGUEZ LÓPEZ","SYDNEY TOWN CORPORATION","RESIDENCIA","PACORA","CIUDAD SANTA FÉ. AVENIDA DE LOS ALTOS. LOTES: N° 1 @ 22 , N° 1 @ 22","PROYECTO ALTOS DE AZUL SM6, TERRAZAS DE ZELEDONIA: CONSTRUCCIÓN DE 28 CASAS MODELO TIPO B EN LOTES No.1 @ No. 28 EN CALLE 8.","ÁREA A CONSTRUIR POR UNIDAD=61.65M²","159329, 159330, 30140008, 30140007 y 455525","794052","8675.65"],
    [107,"NO APLICA","29/08/2026","ATC-745","PMA-564-2026  RDPM-11305","LEZCANO WILSON RICARDO ERNESTO","INDUSTRIAS VIRA, S.A.  /  FONDOS COMERCIALES LA CABIMA, S.A.","COMERCIAL","LAS CUMBRES","CARRETERA TRANSISTMICA","PROYECTO AQUAZUL LA CABIMA: REMODELACIÓN INTERIOR A LOCAL N° 4 EN PLAZA LA CABIMA","ÁREA A INTERVENIR=81.55M ²","277670","40775","407.75"],
    [108,"RLA-I-139","31/08/2026","ATC-724","POB-64-2026  RDP-5817","VICSONS CONSTRUCTION CORPORATION, S.A.","INDUSTRIAS PANAMÁ BOSTON, S.A.  /   PARQUE INDUSTRIAL Y CORPORATIVO SUR, S.A.","COMERCIAL","LAS MAÑANITAS","AVENIDA DOMINGO DÍAZ. LOTE C 26","PROYECTO PLANTA DE MANTECA Y MARGARINA PARQUE SUR. ETAPA DE MOVIMIENTO DE TIERRA, FUNDACIONES E INFRAESTRUCTURA.","MOVIMIENTO DE TIERRA (CORTE - RELLENO)=746.24M³; FUNDACIONES=441.00M³; SISTEMA PLUVIAL Y SANITARIO=119.00M.L.; SISTEMA DE ACUEDUCTO=155.00M.L.MURO 70 M3.","30199836","149001.2","1490.01"],
    [109,"NO APLICA","31/08/2026","ATC-722","PMA-603-2026  RDPM-11355","ERIKA MAYTE BERGUIDO GIL","FOOD LEGENDS, S.A.","COMERCIAL","BELLA VISTA","URBANIZACIÓN OBARRIO. CALLE 50. LOCAL D6","REMODELACIÓN LOCAL D6, SAGA SOHO MALL","ÁREA A INTERVENIR=1200.00M²","12749, 392178, 392189","900000","10000"],
    [110,"NO APLICA","2026-01-09 00:00:00","ATC-737","PMA-258-2026  RDP-10987","PRE CONSTRUCTION, S.A.","CLÍNICA Y HOSPITALES, S.A.","COMERCIAL","SAN FRANCISCO","PAITILLA. VÍA ISRAEL Y CALLE 53 ESTE","REFORMAS EN ÁREAS DE LABOR Y PARTO EN CLINICA HOSPITAL PAITILLA","ÁREA A INTERVENIR=854.47M²","40988","640852.5","6760.66"],
    [111,"NO APLICA","2026-01-09 00:00:00","ATC-751","PMA-650-2026  RDPM-11393","W. S. & ASOCIADOS PANAMÁ, S.A.","INMOBILIARIA DON ANTONIO, S.A.","COMERCIAL","PUEBLO NUEVO","AVENIDA 12 DE OCTUBRE CON AVENIDA LA PULIDA SUPERMERCADO REY","ADECUACIÓN Y EXTENSIÓN DE PLATAFORMA PARA EQUIPOS DE REFRIGERACIÓN EN SUPERMERCADO REY 12 DE OCTUBRE","ÁREA A CONSTRUIR=24.97M²","63243","4369.75","43.7"],
    [112,"NO APLICA","2026-01-09 00:00:00","ATC-752","PMA-599-2026  RDPM-11342","W. S. & ASOCIADOS PANAMÁ, S.A.","INMOBILIARIA DON ANTONIO, S.A.","COMERCIAL","PUEBLO NUEVO","VÍA ESPAÑA","PROYECTO MINISUPER SAN FERNANDO, ADECUACIÓN A LOCAL.","ÁREA A REFORMAR=302.72M²","97767","151360","1513.6"],
    [113,"NO APLICA","2026-01-09 00:00:00","ATC-747","PMA-634-2026  RDPM-11377","PALMER & PALMER CONSTRUCTION INC.","FUNDACIÓN CIUDAD DEL SABER","EDIFICIO","ANCÓN","CIUDAD DEL SABER. CALLE JACINTO PALACIOS","ADECUACIÓN DEL EDIFICIO 225 EN CIUDAD DEL SABER, ANCÓN","CONSTRUCCIÓN DE ESCALERA=104.76M²; SISTEMA DE MANGUERAS=138.00M.L.","30469956","21443","214.43"],
    [114,"NO APLICA","2026-02-09 00:00:00","ATC-744","PMA-641-2026  RDPM-11384","JERÓNIMO IBARRA GONZÁLEZ","360 REAL ESTATE BUSINESS, S.A.","COMERCIAL","CALIDONIA","AVENIDA BALBOA PH THE SANDS. NIVEL 3700","PROYECTO THE TILT: CONSTRUCCIÓN DE ATRACCIÓN MECANICA, NIVEL 3700 LOCAL No.2 EN P.H. THE SANDS.","ÁREA DE PLATAFORMA A CONSTRUIR=9.80M²","30392919","2594.6","25.950000000000003"],
    [115,"NO APLICA","2026-02-09 00:00:00","ATC-589","PMA-183-2026  RDPM-10992","FIRE PROTECTION, S.A.","EVENTOS PUBLICITARIO ALBROOK, S.A INMOBILIARIA ALBROOK, S.A.","COMERCIAL","ANCÓN","ALBROOK. AVENIDA LA AMISTAD","ADECUACIÓN DEL SISTEMA DE GABINETES CONTRA INCENDIO Y CUARTO DE BOMBA DEL C.C. ALBROOK MALL.","CUARTO DE BOMBA=6000.00M²","59644","1200000","12250"],
    [116,"NO APLICA","2026-02-09 00:00:00","ATC-757","PMA-567-2026  RDPM-11309","CIVIL Y LOGISTICA, S.A.","MKH CAPITAL PARTNERS INC.DESARROLLO INMOBILIARIO DEL ESTE, S.A.","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE. CALLE BOULEVARD COSTA DEL ESTE","REMODELACIÓN A OFICINAS MKH EN PLAZA BUSINESS PARK TORRE SUR LADO B PISO 2 COSTA DEL ESTE","ÁREA A REFORMAR=308.00M²","159709","231000","2310"],
    [117,"NO APLICA","2026-02-09 00:00:00","ATC-743","PMA-630-2026   RDPM-11373","ALCIBIADES ANTONIO MEDINA TUÑON","BOBORAS, S.A.","COMERCIAL","JUAN DÍAZ","LLANO BONITO. CALLE 2DA.","MEJORAS EN ACERA Y CORDÓN, NUEVO ACCESO VEHICULAR, PAVIMENTO E INSTALACIÓN DE PUERTAS ENROLLABLES EN EDIFICACIÓN COMERCIAL EXISTENTE","ÁREA A REFORMAR=300.00M²; PUERTA ENROLLABLE 2U.","19690","10580","105.80000000000001"],
    [118,"RLA-I-404","2026-02-09 00:00:00","ATC-755","POB-163-2026  RDP-6005","DERIVADOS DEL PETROLEO, S.A.","INMOBILIARIA SAN FERNANDO S.A COMPLEJOS DEPORTIVOS PANAMÁ, S.A.","COMERCIAL","JUAN DÍAZ","METRO PARK. CALLE BOULEVARD JUAN DÍAZ. LOTE: A-1","FASE 2 \" METRO PARK SPORT COMPLEX : INCLUYE CONST. CANCHA DE SOFTBALL, REUBICACIÓN DE CANCHAS DEPORTIVAS, GRADERÍAS","ÁREAS DE SERVICIO, 131 ESTACIONAMIENTOS Y CERCA PERIMETRAL","131912","973803.75","10922.55"],
    [119,"NO APLICA","2026-03-09 00:00:00","ATC-758","PMA-588-2026  RDPM-11329","AMJ CONSTRUCCIONES, S.A.","GOLDEN BUNS, S.A.COSTA DEL ESTE TOWN CENTER GROUP, S.A.,","COMERCIAL","JUAN DÍAZ","COSTA DEL ESTE. AVENIDA DEL SOL. CALLE DEL SOL, AVENIDA COSTA DEL MAR Y CALLE ANTIGUA","REMODELACIÓN A LOCAL SHAKE SHACK 5, MAYSON KAYSER TOWN CENTER LOCAL No.R2-318 NIVEL 000 SECTOR NORTE EN C.C. TOWN CENTER COSTA DEL ESTE","ÁREA A REFORMAR=235.15M²","30258077","176362.5","1763.63"],
    [120,"RLA-2155","2026-03-09 00:00:00","ATC-735","POC-172-2026  RDP-6031","CODHISA CONSTRUCCIONES E INFRA, S.A.","COMMERCIAL CENTER FUND, INC.","COMERCIAL","SAN FRANCISCO","C.C. MULTIPLAZA PACIFIC. CALLE PUNTA DARIÉN","PROYECTO HOTEL MULTIPLAZA EN C.C. MULTIPLAZA PACIFIC","ETAPA 1 EXCAVACIÓN Y MURO DE RETENCIÓN. MOVIMIENTO DE TIERRA - CORTE=58000M³; MUROS=5071M²","30435865  /  30536583/  8708","2667970","19589.85"],
    [121,"RLA-2112","2026-04-09 00:00:00","ATC-760","POB-178-2026  RDP-6042","BARREIRO TROITINO MANUEL","FUNDACIÓN CIUDAD DEL SABER ASOCIACIÓN PANAMERICANA PARA LA CONSERVACIÓN (GAIA PMA)","EDIFICIO","ANCÓN","CLAYTON. CALLE ROSA ELENA LANDECHO","PROYECTO PANAMÁ NATURE CENTER","FASE N° 1 ADECUACIONES INTERNAS A EDIFICIO N° 249 EXISTENTE Y FASE N° 2 TERRAZA TECHADA POSTERIOR","178392","136885","1368.85"],
    [122,"NO APLICA","2026-04-09 00:00:00","ATC-746","PMA-642-2026  RDPM-11385","ICONOS PANAMÁ, S.A.","TACO MULTIPLAZA, S.A.","COMERCIAL","JUAN DÍAZ","COSTA DEL ESTE. AVENIDA COSTA DEL SOL","REMODELACIÓN A LOCAL COMERCIAL No.5 EN C.C. PLAZA K-57, COSTA DEL ESTE RESTAURANTE TACONTENTO","ÁREA A REFORMAR=271.84M²","259771","203880","2038.8000000000002"],
    [123,"NO APLICA","2026-07-09 00:00:00","ATC-732","PMA-579-2026  RDPM-11320","ERIKA ESTHER MOSQUERA DE BETHANCOURT","EMPRESAS MELO, S.A.","COMERCIAL","ANCÓN","ALBRROK. VÍA MARGINAL","REMODELACIÓN A RESTAURANTE PIO PIO 42, LOCAL No.PS-3 EN GRAN TERMINAL DE TRANSPORTE ALBROOK SUR.","ÁREA A REFORMAR=11.43M²","200609","5715","57.150000000000006"],
    [124,"NO APLICA","2026-07-09 00:00:00","ATC-733","PMA-582-2026  RDPM-11323","ERIKA ESTHER MOSQUERA DE BETHANCOURT","EMPRESAS MELO, S.A.","COMERCIAL","ANCÓN","ALBRROK. VÍA MARGINAL","REMODELACION DE RESTAURANTE PIO PIO 31, LOCAL No.PN-07 EN GRAN TERMINAL DE TRANSPORTE ALBROOK","ÁREA A REFORMAR=17.42M²","200609","8710","87.1"],
    [125,"RLA-I-269","2026-09-09 00:00:00","ATC-768","POB-148-2026  RDP-5979","RODOLFO AUREZ GUTIERREZ UERTA","INVERSIONES RKJ, S.A.","COMERCIAL","JUAN DÍAZ","AVENIDA JOSÉ AGUSTÍN ARANGO. GALERA Y LOTE EXISTENTE.   LOTES:   33, 34, 35 Y 36","CONSTRUCCIÓN DE GALERA NUEVA, ETAPA I","ÁREA A CONSTRUIR=3249.75M²","34601,  61963 Y 34607","1467044.9","13585.22"],
    [126,"RLA-2506","2026-09-09 00:00:00","ATC-726","PO-HAA-173-2025  RDP-5859","CARTEGA CORP.","IPAL TRUST CORP","RESIDENCIA","JUAN DÍAZ","SANTA MARÍA GOLF & COUNTRY CLUB. LOTE: PE-49","CONSTRUCCIÓN DE RESIDENCIA UNIFAMILIAR MODELO SEMI, LOTE PE-49 EN SANTA MARÍA GOLF & COUNTRY CLUB","ÁREA A CONSTRUIR= 518.97M² .  I ETAPA FUNDACIONES","30468941","467073","4670.73"],
    [127,"RLA-1812","2026-10-09 00:00:00","ATC-670","PO-HAC-125-2025  RDP-5696","ADMINISTRACIÓN Y DESARROLLOS URBANOS, S.A.","DESARROLLO ACQUA TRES, S. A.","EDIFICIO","JUAN DÍAZ","COSTA DEL ESTE. AVENIDA COSTA DEL MAR Y CALLE DEL SOL","PROYECTO BLAU: CONSTRUCCION DE EDIFICIO DE APARTAMENTOS RESIDENCIAL.","ÁREA A CONSTRUIR=29676.52M²","259855","14838260","80441.3"],
    [128,"NO APLICA","2026-11-09 00:00:00","ATC-753","PMA-558-2026  RDPM-11299","ACOSTA BETHANCOUR ENRIQUE JOSÉ","QES, S.A.","COMERCIAL","JUAN DÍAZ","URB. SANTA MARÍA BUSINESS DISTRICT. CORREDOR SUR PH SMOP 70 y 71, OFICINA 809","PROYECTO OFICINAS DE QUANTAS ELECTRICAL SERVICES, INC. LOCAL N° 809 EN P.H. SMOP 70 Y 71","ÁREA A REFORMAR=129.00M²","464875","96750","967.5"],
    [129,"NO APLICA","2026-11-09 00:00:00","ATC-764","PMA-645-2026.  RDPM-11389","RONY RICAEL MELGAR CARDENAS","ATLANTIS AIR TRANSPORT INC","COMERCIAL","ANCÓN","ALBROOK. AVENIDA OMAR TORRIJOS AEROPUERTO ALBRROK. LOTE H-1A","AMPLIACION DE HANGAR 1 ALPHA EN ALBROOK","ÁREA A REFORMAR=672.00M²","214532","50400","504"],
    [130,"NO APLICA","14/09/2026","ATC-731","PMA-513-2026  RDPM-11251","GABRIEL ENRIQUE ZARAK DE OBALDIA","PROMOTORA LA 25, S.A.","COMERCIAL","24 DE DICIEMBRE","VÍA PANAMERICANA","TIENDA CARBONE, LOCALES N° C12, C13, C14, C15, C16 Y C17 EN C.C. LA 25 PLAZA","ÁREA A INTERVENIR=709.00M²","444894","531750","5396.88"],
    [131,"NO APLICA","14/09/2026","ATC-718","PMA-98-2026  RDPM-10830","MANUEL FERRER CARDENAS APOLAYO","BELLA VISTA 42, S.A.","EDIFICIO","BELLA VISTA","AVENIDA JUSTO AROSEMENA","REMODELACIÓN INTERNA Y FACHADA A EDIFICIO TELVA","ÁREA A REFORMAR= 2202.29M²","65883","550572.5","5632.16"],
    [132,"NO APLICA","14/09/2026","ATC-761","PMA-631-2026  RDPM-11374","PRODEO MANAGEMENT, S.A.","DELOITTE & TOUCHE INC.","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE. COSTA DEL ESTE","ADECUACIÓN DE OFICINAS DELOITTE EN BUSINESS PARK COSTA DEL ESTE TORRE OESTE B PISO #3.","ÁREA A REFORMAR=1504.00M²","159709","752000","8150"],
    [133,"NO APLICA","14/09/2026","ATC-762","PMA-639-2026  RDPM-11381","PRODEO MANAGEMENT, S.A.","DELOITTE & TOUCHE INC","COMERCIAL","PARQUE LEFEVRE","COSTA DEL ESTE. CALLE BOULEVARD COSTA DEL ESTE Y CALLE LA ROTOMDA PH. TORRE PANAMÁ","ADECUACIÓN DE OFICINAS DELOITTE EN PH TORRE PANAMÁ","NIVELES 1000, 1100 Y 1200. REMOCIÓN ESCALERAS=27.50M²; NUEVA LOSA=45.26M²","358359, 358360, 358361","4494.5","44.95"],
    [134,"NO APLICA","15/09/2026","ATC-759","PMA-517-2026  RDPM-11254","CADPRO FIRE, S.A.","BCT BANK INTERNATIONAL S.A.","COMERCIAL","BETANIA","URBANIZACIÓN EL DORADO. AVENIDA RICARDO J. ALFARO","REMODELACIÓN INTERNA A LOCAL No.4 BCT BANK INTERNATIONAL - SUCURSAL P.H. DORADO MALL.","ÁREA A REFORMAR=177.21M²","30185025","88605","886.05"],
    [135,"RLAB-92","15/09/2026","ATC-716","PO-HAC-210-2025  RDP-6008","CONSTRUCTORA RIGA SERVICES, S.A.","INVERSIONES SANTA MARÍA 2023, S.A.","COMERCIAL","JUAN DÍAZ","URBANIZACIÓN SANTA MARÍA BUSINESS DISTRICT. CALLE BOULEVARD. LOTE 50","PROYECTO TORRE RIGA EN SANTA MARÍA BUSINESS DISTRICT","GLOBO A. EDIFICIO DE OFICINA=7040.65M²; PLAZA ESTACIONAMIENTOS ABIERTOS=5620.08M²","367624/ABIERTO","4082333","26661.67"],
    [136,"RLA-2687","15/09/2026","ATC-748","POC-155-2026   RDP-5983","CONSTRUCCIONES RJT, S.A.","GLOBAL FINANCIAL FUNDS CORP ZURITA JAEN BENJAMIN ALBERTO","COMERCIAL","SAN FRANCISCO","SAN SEBASTIAN. CALLE 56D, CALLE JOSÉ RAMÓN CANTERA. LOTES: B-60, B-61, B-62, B-63","CONSTRUCCIÓN DE LOCAL PARA COMERCIO VECINAL, LOCALES B-60, B-61, B-62 Y B-63","ÁREA A CONSTRUIR=140.35M²","123971, 117831, 124543, 122603","70175","701.75"],
    [137,"NO APLICA","15/09/2026","ATC-770","PMA-491-2026  RDPM-11229","DORA INÉS TORRES ÁLVAREZ","RAÚL ANEL KAM VARGAS  /  CENTRO QUIRURGICO MULTIESPECIALIDADES, S.A.","COMERCIAL","JUAN DÍAZ","COSTA DEL ESTE. AVENIDA COSTA DEL SOL.  PH TIME SQUARE CENTER","PROYECTO CLÍNICA DE CIRUGÍA AMBULATORIA: REMODELACIÓN DE LOCAL N° 601 EN P.H. TIMES SQUARE CENTER, COSTA DEL ESTE","ÁREA A REFORMAR=790.00M²","30300734","592500","6156.25"],
    [138,"NO APLICA","16/09/2026","ATC-779","PMA-596-2026  RDPM-11339","EDWIN ARAÚZ GONZÁLEZ","VAZ Y ASOCIADOS, S.A.","COMERCIAL","PUEBLO NUEVO","MONTE OSCURO. VÍA TRANSISTMICA Y CALLE MONTE OSCURO","REFORMAS A LOCAL COMERCIAL N° 38 EN C.C. LA GRAN ESTACIÓN","ÁREA A INTERVENIR=63.00M²","48841","31500","315"],
    [139,"NO APLICA","16/09/2026","ATC-765","PMA-560-2026  RDPM-11302","JUAN CARLOS DELGADOS CHÁVEZ","COMMERCIAL CENTER FUND, INC.","COMERCIAL","SAN FRANCISCO","PUNTA PACÍFICA. VÍA ISRAEL BOULEVARD PACÍFICA Y CALLE PUNTA DARIEN C.C. MULTIPLAZA PACIFIC. LOTE 1","CONSTRUCCIÓN DE HABITACIONES MODELO PARA NUEVO HOTEL DE CARACTER REMOVIBLE (TEMPORAL) EN C.C. MULTIPLAZA PACIFIC","ÁREA A REFORMAR=265.02M²","30435865","132510","1325.1"],
    [140,"NO APLICA","17/09/2026","ATC-781","PMA-681-2026  RDPM-11425","JACQUELINE IVETTE LEÓN RAMOS","ZHIWEI LU","COMERCIAL","BELLA VISTA","OBARRIO. CALLE RICARDO ARIAS Y CALLE SIN SALIDA","AMPLIACIÓN DE NICHO DE GAS PARA LOCAL N° 1 EN P.H. MACONDO","LOSA DE PISO=2.17M²; PAREDES=6.02M²; LOSA DE TECHO=2.17M²","2671, 2168","2082.15","20.819999999999993"],
    [141,"NO APLICA","17/09/2026","ATC-777","PMA-316-2026  RDPM-11048","KAURY KARINA CUESTA RAMOS","DANIEL ALBERTO DANIEL TAPIA GONZÁLEZ LURYS GUADALUPE HERRERA PEREIRA","RESIDENCIA","SAN FRANCISCO","LOMA ALEGRE. CALLE LOS GIRASOLES","ADECUACIONES A RESIDENCIA ESTUDIO CASA TH","ÁREA A REFORMAR=41.71M²","30138890","10427.5","104.28"],
    [142,"NO APLICA","17/09/2026","ATC-776","PMA-678-2026  RDPM-11421","TRILOGIA ARQUITECTONICA,S.A.","LATAM SPECIALTY COFFEE, S.A","COMERCIAL","BELLA VISTA","EL CANGREJO. AVENIDA MANUEL ESPINOZA BATISTA","REMODELACIÓN DE LOCAL COMERCIAL COSTA COFFEE -PLAZA COMERCIAL EL CANGREJO, LOCAL No.6","ÁREA A INTERVENIR=90.00M²","25726,  25730","45000","450"],
    [143,"RLA-I-100","18/09/2026","ATC-771","PO-HAB-176-2025  RDP-6050","MORNINGS PROPERTY, S.A.","MORNINGS PROPERTY, S.A.","COMERCIAL","LAS MAÑANITAS","AVENIDA JOSÉ MARÍA TORRIJOS","CONSTRUCCIÓN DE GALERA 2 FASE 4 PARQUE LOGISTICO SAN CARLOS","ÁREA A CONSTRUIR=21593.10M²","68334/ 65239 /63791","9716895","54834.48"],
    [144,"NO APLICA","18/09/2026","ATC-786","PMA-663-2026  RDP-11407","MANUEL ENRIQUE CASTAÑO PORTO","TODEN LTD. CORP.","RESIDENCIA","JUAN DÍAZ","COSTA DEL ESTE. CALLE PRIMERA \"M\". LOTE: 9","ADICIÓN Y REMODELACIÓN A VIVIENDA UNIFAMILIAR EN P.B. Y P.A., LOTE N° 9 EN RESIDENCIAL MAGNOLIAS COSTA DEL ESTE","ÁREA A INTERVENIR=79.26M²","219552","27741","277.41"],
    [145,"NO APLICA","21/09/2026","ATC-750","PMA-643-2026  RDPM-11387","JAVIER MANUEL LEONIS OTERO","INVERSIONES BAYCHION, S.A.","COMERCIAL","RÍO ABAJO","VÍA ESPAÑA CON CALLE 14","EDIFICIO INVERSIONES BAYCHON REMODELACIÓN DE LOCALES, MODULO B .LOCALES N° 4, N° 5, N° 6","ÁREA A REFORMAR=778.14M²","7224,  7226","350163","3501.63"],
    [146,"NO APLICA","22/09/2026","ATC-783","PMA-686-2026  RDPM-11430","SERGIO MIGUEL SANTOS BARRIA","ISAIAS CARMELO VÁSQUEZ ARBOLEDA","RESIDENCIA","SAN FRANCISCO","SAN FRANCISCO CENTRO. CALLE LOS GIRASOLES. LOTE : 21","ADICIÓN DE GAZEBO SEMIABIERTO EN RESIDENCIA EXISTENTE","FUNDACIONES=16.46M³; ESTRUCTURA DE CONCRETO ARMADO=1.64M³; ESTRUCTURA DE CARRIOLAS + LAM. DE ZINC=71.97M²; PAREDES DE BLOQUES=46.41M²","38564","8181.75","81.82"],
    [147,"RLA-I-355","23/09/2026","ATC-782","POE-175-2026  RDP-6036","INMOBILIARIA ALMIRANTE, S.A.","LA AUTORIDAD AERONAUTICA CIVIL","INSTITUCIONAL","ANCÓN","ALBRROK.    CALLE DE LOS GUAYACANES Y CALLE TULIPAN AFRICANO. PARCELA A","EDIFICIO 442: AUTORIDAD AERONAUTICA CIVIL","EDIFICIO 442: AUTORIDAD AERONAUTICA CIVIL A=818.09M²","214532","368140.5","3681.41"],
    [148,"NO APLICA","23/09/2026","ATC-767","PMA-658-2026  RDPM-11402","SAÚL ANTONIO ARAÚZ JARAMILLO","PROMOTORA LEWIS 61, S.A.","COMERCIAL","BELLA VISTA","CALLE 60 Y AVENIDA SAMUEL LEWIS. LOTE:  13B","REMODELACIÓN A OFICINA 13B EN PH FORTUNE PLAZA PISO 1300","ÁREA A INTERVENIR=178.67M²","30241558","134002.5","1340.03"],
    [149,"NO APLICA","24/09/2026","ATC-769","PMA-644-2026  RDPM-11386","GRUPO TAFT, S.A.","IVYABBY, S.A.","COMERCIAL","ANCÓN","C.C. ALBROOK MALL","REMODELACIÓN A LOCAL N° PA-8 PARA COMPLEJO GASTRONOMICO .C.C ALBROOK MALL","ÁREA A INTERVENIR=304.00M²","59930","228000","2280"],
    [150,"NO APLICA","25/09/2026","ATC-549","PMA-315-2026  RDPM-11046","OSCAR CASTILLO","FUNDACIÓN ACEVEDO SIMIC","EDIFICIO","SAN FRANCISCO","CALLE PRIMERA LEFEVRE / CALLE 81 ESTE","REMODELACIÓN DE APARTAMENTO APART. 22 PH GOLF TOWER NIVEL 2600","SALIDAS ELÉCTRICAS=210U.; CIELO RASO DE GYPSUM=49.78M²","63043","16729.4","167.29"],
    [151,"NO APLICA","25/09/2026","ATC-664","PMA-414-2026  RDPM-11147","ARTURO ROGELIO HENDRICKS CHEVANNES","ARCOS DORADOS PANAMÁ, S.A.","COMERCIAL","PARQUE LEFEVRE","PARQUE LEFEVRE CENTRO. AVENIDA ERNESTO T. LEFEVRE Y CALLE 82","REMODELACIÓN A RESTAURANTE Mc DONALDS EN PARQUE LEFEVRE","ÁREA A INTERVENIR=154.30M²","8554","77150","771.5"],
    [152,"NO APLICA","25/09/2026","ATC-784","PMA-682-2026  RDPM-11428","ALCIBIADES ANTONIO MEDINA TUÑON","FUNDACIÓN JPA","RESIDENCIA","JUAN DÍAZ","SANTA MARIA GOLF & COUNTRY CLUB. AVENIDA 9NA. LOTE 9-28","AMPLIACIÓN RESIDENCIA OHANA MILELE: AMPLIACIÓN DE PAVIMENTO, TECHADO PARA DEPÓSITO Y ESTACIONAMIENTOS, SALA DE TV, YOGA, AMPLIACIÓN DE DECK, BAR ESTANCIA 2 RECAMARAS Y BAÑOS","ÁREA A INTERVENIR=186.50M²","30504875","93250","932.5"],
    [153,"NO APLICA","28/09/2026","ATC-790","PMA-694-2026  RDPM-11438","ERIKA MAYTE BERGUIDO GIL","PRODUCTOS KIENER, S.A.","COMERCIAL","PUEBLO NUEVO","VÍA SIMÓN BOLÍVAR CON AVENIDA 12 DE OCTUBRE","REMODELACIÓN DE TIENDITA \"KIENER\": INCLUYE REMOD. DE FACHADA EN P.B., CAMBIO DE PUERTA, VENTANAL DE VIDRIO, CIELORASO DE GYPSUM, ADECUACIONES ELECTRICAS, BAÑO NUEVO","ÁREA A INTERVENIR=180.0M²","79867","81000","810"],
    [154,"NO APLICA","28/09/2026","ATC-801","PMA-552-2026  RDPM-11293","LUIS CARLOS ESCALONA CASTILLERO","INK VISUAL GROUP, CORP","COMERCIAL","BETANIA","URBANIZACIÓN INDUSTRIAL ORILLAC. CALLE 81 OESTE","ANEXO DE DEPOSITO A LOCAL COMERCIAL EXISTENTE","ÁREA A CONSTRUIR=28.80M²","41094","12960","129.6"],
    [155,"RLA-I-49","30/09/2026","ATC-796","PO-HAE-29-2026  RDP-6087","CONSTRUCTORA RIGA SERVICES, S.A","CAJA DE SEGURO SOCIAL","INSTITUCIONAL","TOCUMEN","CALLE PANAMERICANA","CONSTRUCCIÓN Y HABILITACIÓN DE UNIDADES DE HEMODIALISIS, DE LA CAJA DE SEGURO SOCIAL.  HOSPITAL IRMA LOURDES TZANETATOS, TOCUMEN.  CONTRATO N° 10089961-08-17 D.G.","FASE 2 ETAPA ESTRUCTURA SOLAMENTE. LOSAS METALDECK=732.79M²; ESCALERA DE HORM.=37.07M²; VIGAS I, CHANELES Y LAMINAS DE ACERO=2143.03M²","18866","437403.5","4374.04"],
    [156,"RLA-I-133","30/09/2026","ATC-789","POB-186-2026  RDP-6071","OMAR HILDEBRANDO BATISTA HERRERA","SHAN WEI ZOU HO GRUPO INVERSIONES COMERCIAL Z&Z, S.A.","COMERCIAL","PACORA","LAS GARZAS. CARRETERA PANAMERICANA. LOTE 1","LOCALES COMERCIALES Y ESTACIÓN DE COMBUSTIBLE","INCLUYE (6) LOCALES CON MEZZANINE C/U, 4 SURTIDORAS DE GASOLINA Y AREA DE CARGA Y DESCARGA","171885","802254.25","8778.18"],
    [157,"RLA-1749","30/09/2026","ATC-756","POC-139-2026  RDP-5952","PETRONICS INTERNACIONAL, S.A.","PETROPRIX INTERNACIONAL, S.A.","COMERCIAL","PACORA","TATARÉ. AVENIDA JOSÉ AGUSTÍN ARANGO","PROYECTO UNIDAD DE SUMINISTRO DE COMBUSTIBLE AUTOMÁTICA Y AUTOSERVICIO - PACORA","CERCA DE BLOQUES=57.75M²; CIMIENTOS DE BLOQUES=38.5M²; MEDIA CAÑA CON PARRILLA=87.65M.L.; PAVIMENTO DE HORM.=1507.19M²; CAMARAS DE INSPECCIÓN=4U.; INFRAESTRUCTURA TUBERÍAS DE CONCRETO=68.15M.L.; TECHO DE ACERO GALV.=260M²; COLUMNAS DE ACERO=5.97M.L.; TANQUES DE COMBUSTIBLE=34.22M²; SURTIDORAS DE GASOLINA=4U.; TINAQUERA=1.10M²; GRAMA=130M²; SALIDAS DE ALARMA=10U.; LAVAMANOS=2U; INODOROS=4U.; TINA=1U.; VERJAS=2M²; MOV. DE TIERRA=342.2M²; SALIDAS DE ELÉCTRICIDAD=30U.; CORDÓN - CUNETA=137.5M.L.","30223964","154245.9","2022.46"]
]}
