<data>
<row _id="1"><CORREDOR>Corredor Norte</CORREDOR><25-ene>B/.6,164,876</25-ene></row>
<row _id="2"><CORREDOR>Corredor Sur</CORREDOR><25-ene>B/.5,809,439</25-ene></row>
<row _id="3"><CORREDOR>Corredor Este</CORREDOR><25-ene>B/.1,676,316</25-ene></row>
</data>
