﻿_id	CORREDOR	25-ene	25-feb
1	Corredor Norte	6,164,876.00	5,980,937.00
2	Corredor Sur	5,809,439.00	5,556,063.00
3	Corredor Este	1,676,316.00	1,693,611.00
