  "fields": [{"id":"_id","type":"int"},{"id":"No.","type":"text"},{"id":"mes","type":"text"},{"id":"Empresa","type":"text"},{"id":"Proyecto","type":"text"},{"id":"Provincia","type":"text"},{"id":"Distrito","type":"text"},{"id":"Corregimiento","type":"text"},{"id":"MW","type":"text"},{"id":"Fecha de Operacin Comercial","type":"text"},{"id":"Estatus","type":"text"},{"id":"Tecnologa","type":"text"}],
  "records": [
    [1,"1","enero ","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [2,"2","enero ","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [3,"3","enero ","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [4,"4","enero ","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [5,"5","enero ","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [6,"6","enero ","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [7,"7","enero "," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [8,"8","enero ","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [9,"9","enero ","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [10,"10","enero ","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [11,"11","enero ","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [12,"12","enero ","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [13,"13","enero ","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [14,"14","enero ","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [15,"15","enero ","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [16,"16","enero ","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [17,"17","enero ","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [18,"18","enero ","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [19,"19","enero ","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [20,"20","enero ","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [21,"21","enero ","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [22,"22","enero ","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [23,"23","enero ","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [24,"24","enero ","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [25,"25","enero ","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [26,"26","enero ","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [27,"27","enero ","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [28,"28","enero ","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [29,"29","enero ","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [30,"30","enero ","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [31,"31","enero ","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [32,"32","enero ","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [33,"33","enero ","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [34,"34","enero ","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [35,"35","enero ","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [36,"36","enero ","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [37,"37","enero ","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [38,"38","enero ","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [39,"39","enero ","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [40,"40","enero ","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [41,"41","enero ","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [42,"42","enero ","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [43,"43","enero ","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [44,"44","enero ","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [45,"45","enero ","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [46,"46","enero ","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [47,"47","enero ","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [48,"48","enero ","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [49,"49","enero ","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [50,"50","enero ","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [51,"51","enero ","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [52,"52","enero ","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [53,"53","enero ","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [54,"54","enero ","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [55,"55","enero ","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [56,"56","enero ","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [57,"57","enero ","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [58,"58","enero ","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [59,"59","enero ","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [60,"60","enero ","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [61,"61","enero ","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [62,"62","enero ","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [63,"63","enero ","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [64,"64","enero ","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [65,"65","enero ","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [66,"66","enero ","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [67,"67","enero ","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [68,"68","enero ","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [69,"69","enero ","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [70,"70","enero ","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [71,"71","enero ","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [72,"72","enero ","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [73,"73","enero "," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [74,"74*","enero ","UrbaliaPanam,S.A.","Cerro Patacn","Panam","Panam","Ancn","8.10","Por definir ","PRUEBA","Biogas"],
    [75," * ","","No forma parte del plantel de generacin actual del Mercado Elctrico Panameo. Recurso de reconsideracin","","","","","","","",""],
    [76,"","","","","","","","","","",""],
    [77,"","","","","","","","","","",""],
    [78,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [79,"1","febrero ","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [80,"2","febrero ","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [81,"3","febrero ","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [82,"4","febrero ","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [83,"5","febrero ","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [84,"6","febrero ","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [85,"7","febrero "," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [86,"8","febrero ","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [87,"9","febrero ","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [88,"10","febrero ","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [89,"11","febrero ","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [90,"12","febrero ","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [91,"13","febrero ","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [92,"14","febrero ","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [93,"15","febrero ","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [94,"16","febrero ","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [95,"17","febrero ","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [96,"18","febrero ","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [97,"19","febrero ","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [98,"20","febrero ","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [99,"21","febrero ","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [100,"22","febrero ","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [101,"23","febrero ","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [102,"24","febrero ","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [103,"25","febrero ","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [104,"26","febrero ","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [105,"27","febrero ","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [106,"28","febrero ","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [107,"29","febrero ","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [108,"30","febrero ","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [109,"31","febrero ","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [110,"32","febrero ","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [111,"33","febrero ","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [112,"34","febrero ","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [113,"35","febrero ","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [114,"36","febrero ","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [115,"37","febrero ","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [116,"38","febrero ","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [117,"39","febrero ","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [118,"40","febrero ","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [119,"41","febrero ","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [120,"42","febrero ","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [121,"43","febrero ","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [122,"44","febrero ","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [123,"45","febrero ","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [124,"46","febrero ","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [125,"47","febrero ","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [126,"48","febrero ","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [127,"49","febrero ","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [128,"50","febrero ","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [129,"51","febrero ","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [130,"52","febrero ","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [131,"53","febrero ","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [132,"54","febrero ","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [133,"55","febrero ","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [134,"56","febrero ","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [135,"57","febrero ","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [136,"58","febrero ","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [137,"59","febrero ","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [138,"60","febrero ","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [139,"61","febrero ","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [140,"62","febrero ","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [141,"63","febrero ","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [142,"64","febrero ","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [143,"65","febrero ","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [144,"66","febrero ","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [145,"67","febrero ","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [146,"68","febrero ","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [147,"69","febrero ","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [148,"70","febrero ","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [149,"71","febrero ","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [150,"72","febrero ","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [151,"73","febrero ","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [152,"74","febrero "," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [153,"75*","febrero ","UrbaliaPanam,S.A.","Cerro Patacn","Panam","Panam","Ancn","8.10","Por definir ","PRUEBA","Biogas"],
    [154,"*","","No forma parte del plantel de generacin actual del Mercado Elctrico Panameo. Recurso de reconsideracin","","","","","","","",""],
    [155,"","","","","","","","","","",""],
    [156,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [157,"1","marzo ","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [158,"2","marzo ","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [159,"3","marzo ","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [160,"4","marzo ","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [161,"5","marzo ","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [162,"6","marzo ","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [163,"7","marzo "," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [164,"8","marzo ","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [165,"9","marzo ","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [166,"10","marzo ","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [167,"11","marzo ","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [168,"12","marzo ","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [169,"13","marzo ","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [170,"14","marzo ","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [171,"15","marzo ","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [172,"16","marzo ","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [173,"17","marzo ","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [174,"18","marzo ","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [175,"19","marzo ","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [176,"20","marzo ","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [177,"21","marzo ","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [178,"22","marzo ","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [179,"23","marzo ","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [180,"24","marzo ","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [181,"25","marzo ","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [182,"26","marzo ","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [183,"27","marzo ","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [184,"28","marzo ","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [185,"29","marzo ","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [186,"30","marzo ","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [187,"31","marzo ","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [188,"32","marzo ","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [189,"33","marzo ","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [190,"34","marzo ","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [191,"35","marzo ","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [192,"36","marzo ","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [193,"37","marzo ","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [194,"38","marzo ","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [195,"39","marzo ","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [196,"40","marzo ","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [197,"41","marzo ","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [198,"42","marzo ","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [199,"43","marzo ","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [200,"44","marzo ","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [201,"45","marzo ","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [202,"46","marzo ","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [203,"47","marzo ","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [204,"48","marzo ","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [205,"49","marzo ","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [206,"50","marzo ","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [207,"51","marzo ","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [208,"52","marzo ","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [209,"53","marzo ","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [210,"54","marzo ","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [211,"55","marzo ","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [212,"56","marzo ","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [213,"57","marzo ","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [214,"58","marzo ","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [215,"59","marzo ","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [216,"60","marzo ","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [217,"61","marzo ","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [218,"62","marzo ","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [219,"63","marzo ","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [220,"64","marzo ","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [221,"65","marzo ","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [222,"66","marzo ","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [223,"67","marzo ","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [224,"68","marzo ","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [225,"69","marzo ","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [226,"70","marzo ","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [227,"71","marzo ","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [228,"72","marzo ","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [229,"73","marzo ","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [230,"74","marzo "," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [231,"75*","marzo ","UrbaliaPanam,S.A.","Cerro Patacn","Panam","Panam","Ancn","8.10","Por definir ","PRUEBA","Biogas"],
    [232,"*","","No forma parte del plantel de generacin actual del Mercado Elctrico Panameo. Recurso de reconsideracin","","","","","","","",""],
    [233,"","","","","","","","","","",""],
    [234,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [235,"1","abril","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [236,"2","abril","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [237,"3","abril","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [238,"4","abril","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [239,"5","abril","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [240,"6","abril","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [241,"7","abril"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [242,"8","abril","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [243,"9","abril","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [244,"10","abril","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [245,"11","abril","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [246,"12","abril","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [247,"13","abril","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [248,"14","abril","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [249,"15","abril","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [250,"16","abril","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [251,"17","abril","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [252,"18","abril","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [253,"19","abril","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [254,"20","abril","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [255,"21","abril","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [256,"22","abril","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [257,"23","abril","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [258,"24","abril","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [259,"25","abril","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [260,"26","abril","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [261,"27","abril","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [262,"28","abril","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [263,"29","abril","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [264,"30","abril","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [265,"31","abril","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [266,"32","abril","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [267,"33","abril","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [268,"34","abril","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [269,"35","abril","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [270,"36","abril","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [271,"37","abril","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [272,"38","abril","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [273,"39","abril","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [274,"40","abril","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [275,"41","abril","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [276,"42","abril","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [277,"43","abril","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [278,"44","abril","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [279,"45","abril","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [280,"46","abril","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [281,"47","abril","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [282,"48","abril","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [283,"49","abril","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [284,"50","abril","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [285,"51","abril","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [286,"52","abril","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [287,"53","abril","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [288,"54","abril","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [289,"55","abril","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [290,"56","abril","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [291,"57","abril","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [292,"58","abril","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [293,"59","abril","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [294,"60","abril","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [295,"61","abril","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [296,"62","abril","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [297,"63","abril","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [298,"64","abril","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [299,"65","abril","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [300,"66","abril","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [301,"67","abril","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [302,"68","abril","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [303,"69","abril","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [304,"70","abril","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [305,"71","abril","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [306,"72","abril","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [307,"73","abril","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [308,"74","abril"," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [309,"75*","abril","UrbaliaPanam,S.A.","Cerro Patacn","Panam","Panam","Ancn","8.10","Por definir ","PRUEBA","Biogas"],
    [310,"*","","No forma parte del plantel de generacin actual del Mercado Elctrico Panameo. Recurso de reconsideracin","","","","","","","",""],
    [311,"","","","","","","","","","",""],
    [312,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [313,"1","mayo","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [314,"2","mayo","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [315,"3","mayo","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [316,"4","mayo","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [317,"5","mayo","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [318,"6","mayo","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [319,"7","mayo"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [320,"8","mayo","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [321,"9","mayo","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [322,"10","mayo","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [323,"11","mayo","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [324,"12","mayo","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [325,"13","mayo","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [326,"14","mayo","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [327,"15","mayo","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [328,"16","mayo","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [329,"17","mayo","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [330,"18","mayo","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [331,"19","mayo","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [332,"20","mayo","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [333,"21","mayo","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [334,"22","mayo","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [335,"23","mayo","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [336,"24","mayo","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [337,"25","mayo","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [338,"26","mayo","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [339,"27","mayo","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [340,"28","mayo","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [341,"29","mayo","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [342,"30","mayo","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [343,"31","mayo","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [344,"32","mayo","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [345,"33","mayo","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [346,"34","mayo","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [347,"35","mayo","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [348,"36","mayo","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [349,"37","mayo","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [350,"38","mayo","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [351,"39","mayo","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [352,"40","mayo","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [353,"41","mayo","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [354,"42","mayo","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [355,"43","mayo","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [356,"44","mayo","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [357,"45","mayo","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [358,"46","mayo","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [359,"47","mayo","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [360,"48","mayo","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [361,"49","mayo","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [362,"50","mayo","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [363,"51","mayo","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [364,"52","mayo","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [365,"53","mayo","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [366,"54","mayo","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [367,"55","mayo","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [368,"56","mayo","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [369,"57","mayo","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [370,"58","mayo","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [371,"59","mayo","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [372,"60","mayo","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [373,"61","mayo","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [374,"62","mayo","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [375,"63","mayo","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [376,"64","mayo","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [377,"65","mayo","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [378,"66","mayo","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [379,"67","mayo","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [380,"68","mayo","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [381,"69","mayo","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [382,"70","mayo","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [383,"71","mayo","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [384,"72","mayo","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [385,"73","mayo","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [386,"74","mayo"," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [387,"75*","mayo","UrbaliaPanam,S.A.","Cerro Patacn","Panam","Panam","Ancn","8.10","Por definir ","PRUEBA","Biogas"],
    [388,"*","","No forma parte del plantel de generacin actual del Mercado Elctrico Panameo. Recurso de reconsideracin","","","","","","","",""],
    [389,"","","","","","","","","","",""],
    [390,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [391,"1","junio","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [392,"2","junio","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [393,"3","junio","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [394,"4","junio","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [395,"5","junio","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [396,"6","junio","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [397,"7","junio"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [398,"8","junio","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [399,"9","junio","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [400,"10","junio","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [401,"11","junio","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [402,"12","junio","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [403,"13","junio","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [404,"14","junio","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [405,"15","junio","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [406,"16","junio","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [407,"17","junio","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [408,"18","junio","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [409,"19","junio","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [410,"20","junio","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [411,"21","junio","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [412,"22","junio","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [413,"23","junio","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [414,"24","junio","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [415,"25","junio","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [416,"26","junio","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [417,"27","junio","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [418,"28","junio","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [419,"29","junio","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [420,"30","junio","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [421,"31","junio","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [422,"32","junio","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [423,"33","junio","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [424,"34","junio","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [425,"35","junio","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [426,"36","junio","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [427,"37","junio","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [428,"38","junio","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [429,"39","junio","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [430,"40","junio","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [431,"41","junio","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [432,"42","junio","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [433,"43","junio","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [434,"44","junio","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [435,"45","junio","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [436,"46","junio","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [437,"47","junio","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [438,"48","junio","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [439,"49","junio","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [440,"50","junio","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [441,"51","junio","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [442,"52","junio","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [443,"53","junio","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [444,"54","junio","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [445,"55","junio","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [446,"56","junio","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [447,"57","junio","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [448,"58","junio","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [449,"59","junio","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [450,"60","junio","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [451,"61","junio","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [452,"62","junio","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [453,"63","junio","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [454,"64","junio","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [455,"65","junio","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [456,"66","junio","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [457,"67","junio","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [458,"68","junio","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [459,"69","junio","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [460,"70","junio","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [461,"71","junio","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [462,"72","junio","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [463,"73","junio","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [464,"74","junio"," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [465,"75*","junio","UrbaliaPanam,S.A.","Cerro Patacn","Panam","Panam","Ancn","8.10","Por definir ","PRUEBA","Biogas"],
    [466,"*","","No forma parte del plantel de generacin actual del Mercado Elctrico Panameo. Recurso de reconsideracin","","","","","","","",""],
    [467,"","","","","","","","","","",""],
    [468,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [469,"1","julio","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [470,"2","julio","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [471,"3","julio","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [472,"4","julio","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [473,"5","julio","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [474,"6","julio","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [475,"7","julio"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [476,"8","julio","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [477,"9","julio","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [478,"10","julio","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [479,"11","julio","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [480,"12","julio","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [481,"13","julio","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [482,"14","julio","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [483,"15","julio","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [484,"16","julio","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [485,"17","julio","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [486,"18","julio","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [487,"19","julio","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [488,"20","julio","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [489,"21","julio","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [490,"22","julio","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [491,"23","julio","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [492,"24","julio","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [493,"25","julio","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [494,"26","julio","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [495,"27","julio","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [496,"28","julio","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [497,"29","julio","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [498,"30","julio","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [499,"31","julio","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [500,"32","julio","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [501,"33","julio","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [502,"34","julio","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [503,"35","julio","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [504,"36","julio","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [505,"37","julio","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [506,"38","julio","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [507,"39","julio","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [508,"40","julio","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [509,"41","julio","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [510,"42","julio","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [511,"43","julio","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [512,"44","julio","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [513,"45","julio","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [514,"46","julio","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [515,"47","julio","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [516,"48","julio","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [517,"49","julio","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [518,"50","julio","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [519,"51","julio","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [520,"52","julio","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [521,"53","julio","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [522,"54","julio","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [523,"55","julio","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [524,"56","julio","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [525,"57","julio","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [526,"58","julio","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [527,"59","julio","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [528,"60","julio","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [529,"61","julio","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [530,"62","julio","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [531,"63","julio","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [532,"64","julio","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [533,"65","julio","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [534,"66","julio","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [535,"67","julio","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [536,"68","julio","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [537,"69","julio","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [538,"70","julio","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [539,"71","julio","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [540,"72","julio","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [541,"73","julio","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [542,"74","julio"," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [543,"","","","","","","","","","",""],
    [544,"","","","","","","","","","",""],
    [545,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [546,"1","Agosto","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [547,"2","Agosto","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [548,"3","Agosto","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [549,"4","Agosto","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [550,"5","Agosto","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [551,"6","Agosto","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [552,"7","Agosto"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [553,"8","Agosto","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [554,"9","Agosto","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [555,"10","Agosto","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [556,"11","Agosto","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [557,"12","Agosto","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [558,"13","Agosto","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [559,"14","Agosto","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [560,"15","Agosto","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [561,"16","Agosto","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [562,"17","Agosto","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [563,"18","Agosto","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [564,"19","Agosto","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [565,"20","Agosto","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [566,"21","Agosto","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [567,"22","Agosto","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [568,"23","Agosto","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [569,"24","Agosto","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [570,"25","Agosto","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [571,"26","Agosto","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [572,"27","Agosto","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [573,"28","Agosto","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [574,"29","Agosto","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [575,"30","Agosto","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [576,"31","Agosto","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [577,"32","Agosto","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [578,"33","Agosto","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [579,"34","Agosto","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [580,"35","Agosto","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [581,"36","Agosto","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [582,"37","Agosto","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [583,"38","Agosto","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [584,"39","Agosto","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [585,"40","Agosto","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [586,"41","Agosto","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [587,"42","Agosto","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [588,"43","Agosto","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [589,"44","Agosto","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [590,"45","Agosto","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [591,"46","Agosto","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [592,"47","Agosto","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [593,"48","Agosto","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [594,"49","Agosto","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [595,"50","Agosto","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [596,"51","Agosto","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [597,"52","Agosto","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [598,"53","Agosto","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [599,"54","Agosto","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [600,"55","Agosto","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [601,"56","Agosto","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [602,"57","Agosto","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [603,"58","Agosto","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [604,"59","Agosto","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [605,"60","Agosto","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [606,"61","Agosto","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [607,"62","Agosto","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [608,"63","Agosto","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [609,"64","Agosto","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [610,"65","Agosto","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [611,"66","Agosto","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [612,"67","Agosto","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [613,"68","Agosto","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [614,"69","Agosto","MASPV Panama Inc .","Sunrise Maspv 2 ","Panama Oeste ","Zanguenga","Herrera","3.3","Por definir ","Prueba ","Fotovoltaica"],
    [615,"70","Agosto","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [616,"71","Agosto","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [617,"72","Agosto","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [618,"73","Agosto","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [619,"74","Agosto","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [620,"75","Agosto"," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [621,"","","","","","","","","","",""],
    [622,"","","","","","","","","","",""],
    [623,"No.","mes ","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [624,"1","septiembre","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","32.42","Operacin","Operacin","Trmicas "],
    [625,"2","septiembre","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [626,"3","septiembre","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [627,"4","septiembre","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [628,"5","septiembre","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [629,"6","septiembre","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [630,"7","septiembre"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [631,"8","septiembre","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [632,"9","septiembre","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [633,"10","septiembre","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [634,"11","septiembre","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panama","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [635,"12","septiembre","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [636,"13","septiembre","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [637,"14","septiembre","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [638,"15","septiembre","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [639,"16","septiembre","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,.4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4","Operacin Comercial","Fotovoltaica "],
    [640,"17","septiembre","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [641,"18","septiembre","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [642,"19","septiembre","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [643,"20","septiembre","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [644,"21","septiembre","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [645,"22","septiembre","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [646,"23","septiembre","Llano Snchez Solar Power, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [647,"24","septiembre","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [648,"25","septiembre","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [649,"26","septiembre","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [650,"27","septiembre","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [651,"28","septiembre","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [652,"29","septiembre","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [653,"30","septiembre","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [654,"31","septiembre","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [655,"32","septiembre","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [656,"33","septiembre","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [657,"34","septiembre","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [658,"35","septiembre","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [659,"36","septiembre","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [660,"37","septiembre","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [661,"38","septiembre","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [662,"39","septiembre","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [663,"40","septiembre","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [664,"41","septiembre","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [665,"42","septiembre","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [666,"43","septiembre","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\nPrueba  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [667,"44","septiembre","AES Panam S.R.L","Mayorca Solar Etapa I","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [668,"45","septiembre","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [669,"46","septiembre","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","Por definir ","PRUEBA","Fotovoltaica"],
    [670,"47","septiembre","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [671,"48","septiembre","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n23 de marzo de 2023 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [672,"49","septiembre","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","Por definir ","PRUEBA","Fotovoltaica"],
    [673,"50","septiembre","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [674,"51","septiembre","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [675,"52","septiembre","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [676,"53","septiembre","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [677,"54","septiembre","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","Por definir ","Prueba ","Fotovoltaica"],
    [678,"55","septiembre","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [679,"56","septiembre","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","Por definir ","Prueba ","Fotovoltaica"],
    [680,"57","septiembre","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [681,"58","septiembre","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [682,"59","septiembre","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","25.90","Por definir ","Prueba ","Fotovoltaica"],
    [683,"60","septiembre","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [684,"61","septiembre","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [685,"62","septiembre","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [686,"63","septiembre","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [687,"64","septiembre","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [688,"65","septiembre","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [689,"66","septiembre","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [690,"67","septiembre","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [691,"68","septiembre","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [692,"69","septiembre","MASPV Panama Inc .","Sunrise Maspv 2 ","Panama Oeste ","Zanguenga","Herrera","3.3","Por definir ","Prueba ","Fotovoltaica"],
    [693,"70","septiembre","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [694,"71","septiembre","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [695,"72","septiembre","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [696,"73","septiembre","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [697,"74","septiembre","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [698,"75","septiembre"," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","Por definir ","Prueba ","Elicas"],
    [699,"","","","","","","","","","",""],
    [700,"","","","","","","","","","",""],
    [701,"No.","Mes","Empresa","Proyecto","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa"],
    [702,"1","octubre","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza,Torty, La Miel (solar), Puerto Obaldia y Pedro Gonzlez) Bocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","35.00","Operacin","Operacin","Trmicas"],
    [703,"2","octubre","Seneca Energy, S.A.","Palmas Bellas","Coln","Chagres","Palmas Bellas","1.50","Operacin","Operacin","Trmicas"],
    [704,"3","octubre","Seneca Energy, S.A.","Isla Grande","Coln","Portobelo","Isla Grande","1.50","Operacin","Operacin","Trmicas"],
    [705,"4","octubre","Seneca Energy, S.A.","Palenque","Coln","Santa Isabel","Palenque","2.00","Operacin","Operacin","Trmicas"],
    [706,"5","octubre","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas"],
    [707,"6","octubre","Generadora del Atlntico, S.A.","Termo Coln","Coln","Coln","Cativ","150.00","G1 jul-09, G2 sep-09, G3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas"],
    [708,"7","octubre","Pan-Am Generating Limited","Panam  I  y II","Panam Oeste","Chorrera","El Arado","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas"],
    [709,"8","octubre","Gas Natural Atlantico  S. de R.L.","Costa Norte","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas"],
    [710,"9","octubre","Tropitermica, S.A.","Tropitermica","Coln","Coln","Cristbal","5.05","Por definir","PRUEBA","Trmicas"],
    [711,"10","octubre","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista","49.20","Por definir","PRUEBA","Trmicas"],
    [712,"11","octubre","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora","Panama","Panam","Pacora","53.53","28 de enero de 2023","Operacin Comercial","Trmicas"],
    [713,"12","octubre","Generadora de Gatun, S.A.","Proyecto Gatn","Coln","Coln","Cristobal","670.00","Por definir","PRUEBA","Trmicas"],
    [714,"13","octubre","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica"],
    [715,"14","octubre","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","43742","Operacin Comercial","Fotovoltaica"],
    [716,"15","octubre","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica"],
    [717,"16","octubre","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica"],
    [718,"17","octubre","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4\n7 de febrero de 2024 (Etapa 5)","Operacin Comercial","Fotovoltaica"],
    [719,"18","octubre","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica"],
    [720,"19","octubre","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica"],
    [721,"20","octubre","Solar Cocl Venture,  S de R. L.","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica"],
    [722,"21","octubre","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir","PRUEBA","Fotovoltaica"],
    [723,"22","octubre","Hidroiberica , S.A.","El Fraile Solar I","Cocl","Nat","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica"],
    [724,"23","octubre","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir","PRUEBA","Fotovoltaica"],
    [725,"24","octubre","Gena Solar, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica"],
    [726,"25","octubre","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir","PRUEBA","Fotovoltaica"],
    [727,"26","octubre","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce","El Roble","10.00","Por definir","PRUEBA","Fotovoltaica"],
    [728,"27","octubre","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce","El Roble","10.00","Por definir","PRUEBA","Fotovoltaica"],
    [729,"28","octubre","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce","El Roble","10.00","Por definir","PRUEBA","Fotovoltaica"],
    [730,"29","octubre","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [731,"30","octubre","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [732,"31","octubre","Concepto Solar, S.A.","Bejuco Solar","Panama Oeste","Chame","Bejuco","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [733,"32","octubre","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir","PRUEBA","Fotovoltaica"],
    [734,"33","octubre","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir","PRUEBA","Fotovoltaica"],
    [735,"34","octubre","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir","PRUEBA","Fotovoltaica"],
    [736,"35","octubre","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir","PRUEBA","Fotovoltaica"],
    [737,"36","octubre","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir","PRUEBA","Fotovoltaica"],
    [738,"37","octubre","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble","9.90","27 de abril de 2021","Operacin Comercial","Fotovoltaica"],
    [739,"38","octubre","Solpac Investment, S.A.","Pacora  II","Panam","Chepo","Pacora","3.00","Por definir","PRUEBA","Fotovoltaica"],
    [740,"39","octubre","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial","Fotovoltaica"],
    [741,"40","octubre","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu","Bar","Progreso","10.00","14 de julio de 2021","Operacin Comercial","Fotovoltaica"],
    [742,"41","octubre","Photovoltaics Developments","Ecosolar 2","Chiriqu","Bar","Progreso","10.00","14 de julio de 2021","Operacin Comercial","Fotovoltaica"],
    [743,"42","octubre","Avanzalia Panam, S.A.","Penonom","Cocl","Penonom","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [744,"43","octubre","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [745,"44","octubre","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y Etapa III .","Veraguas","Santiago","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase) 23 de agosto de 2023  (III Fase)","Operacin Comercial (fase\nI y II)","Fotovoltaica"],
    [746,"45","octubre","AES Panam S.R.L","Mayorca","Los Santos","Pocr","Paraso","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [747,"46","octubre","AES Panam S.R.L","Pes Solar","Herrera","Pes","Las Cabras","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [748,"47","octubre","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","19-abr-24","Operacin Comercial","Fotovoltaica"],
    [749,"48","octubre","Celsolar S.A.","Prudencia","Chiriqu","David","Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [750,"49","octubre","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu","Boqueron","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n21 de mayo de 2024 (II Fase prueba)","Operacin Comercial","Fotovoltaica"],
    [751,"50","octubre","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","45463","Operacin Comercial","Fotovoltaica"],
    [752,"51","octubre","AES Panam S.R.L","Caoba Solar","Chiriqu","Boqueron","Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [753,"52","octubre","AES Panam S.R.L","Cedro Solar","Chiriqu","Boqueron","Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [754,"53","octubre","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir","Prueba","Fotovoltaica"],
    [755,"54","octubre","Generadora Solar  Austral, S.A.","Madre Vieja","Chiriqu","Bar","Progreso","25.00","Por definir","Prueba","Fotovoltaica"],
    [756,"55","octubre","Argentum Solar, S.A.","Ro de Jess Etapa I y  II","Veraguas","Ro de Jess","Ro de Jess","12.50","21 de marzo de 2024 (II Fase) 12 de julio de 2023 (I Fase) en prueba (III Fase)","Operacin Comercial","Fotovoltaica"],
    [757,"56","octubre","Oro  Solar, S.A.","Oro  Solar Etapa I y  II","Herrera","Parita","Parita","9.90","27 de mayo de 2024 (Fase II) 10 de julio de 2023(Fase I)","Operacin Comercial","Fotovoltaica"],
    [758,"57","octubre","Andreas Power Energy, Corp.","Andreas Power","Chiriqu","San Felix","San Felix","0.99","22-ago-24","Operacin Comercial","Fotovoltaica"],
    [759,"58","octubre","Panasolar Green Energy Corp.","Panasolar II","Cocl","Aguadulce","El Roble","5.00","Por definir","Prueba","Fotovoltaica"],
    [760,"59","octubre","Panasolar Green  Power  S.A.","Panasolar III","Cocl","Aguadulce","El Roble","5.00","Por definir","Prueba","Fotovoltaica"],
    [761,"60","octubre","Generadora Solar  El Puerto,  S.A.","Baco Solar","Chiriqui","Bar","Progreso","23.90","Por definir","Prueba","Fotovoltaica"],
    [762,"61","octubre","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso","10.00","Por definir","Prueba","Fotovoltaica"],
    [763,"62","octubre","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso","10.00","Por definir","Prueba","Fotovoltaica"],
    [764,"63","octubre","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso","10.00","Por definir","Prueba","Fotovoltaica"],
    [765,"64","octubre","Pedregalito Solar Power S.A.","Pedregalito Solar Power","Chiriqu","Alanje","El Tejar","9.90","Por definir","Prueba","Fotovoltaica"],
    [766,"65","octubre","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo","5.00","Por definir","Prueba","Fotovoltaica"],
    [767,"66","octubre","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato","9.99","Por definir","Prueba","Fotovoltaica"],
    [768,"67","octubre","Caldera Energy Corp.","Mendre Solar","Chiriqu","Boquete","Caldera","5.50","Por definir","Prueba","Fotovoltaica"],
    [769,"68","octubre","Solar Energy Park Enterprises, Inc.","Rodeo Solar","Panam Oeste","San Carlos","San Carlos","9.90","45463","Operacin Comercial","Fotovoltaica"],
    [770,"69","octubre","Tinto Solar, S.A.","Chame Solar","Panama Oeste","Chame","El Libano","19.80","Por definir","Prueba","Fotovoltaica"],
    [771,"70","octubre","MASPV Panama Inc .","Sunrise Maspv 2","Panama Oeste","Zanguenga","Herrera","3.30","Por definir","Prueba","Fotovoltaica"],
    [772,"71","octubre","Aguafuerte S.A.","Solarpro","Chiriqu -Bar-Progreso","Bar","Progreso","10.00","Por definir","Prueba","Fotovoltaica"],
    [773,"72","octubre","Aquavoltaics, S.A.","SolarPro 2","Chiriqu -Bar-Progreso","Bar","Progreso","5.00","Por definir","Prueba","Fotovoltaica"],
    [774,"73","octubre","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [775,"74","octubre","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [776,"75","octubre","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [777,"76","octubre","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [778,"77","octubre","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [779,"78","octubre","Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom- Toabre","Tol","66.00","25 de abril de 2024","Operacin Comercial","Elicas"],
    [780,"","","","","","","","","","",""],
    [781,"No.","Mes","Empresa","Proyecto","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa"],
    [782,"1","noviembre","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza,Torty, La Miel (solar), Puerto Obaldia y Pedro Gonzlez)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","35.00","Operacin","Operacin","Trmicas "],
    [783,"2","noviembre","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.50","Operacin","Operacin","Trmicas "],
    [784,"3","noviembre","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.50","Operacin","Operacin","Trmicas "],
    [785,"4","noviembre","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2.00","Operacin","Operacin","Trmicas "],
    [786,"5","noviembre","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155.00","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [787,"6","noviembre","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150.00","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [788,"7","noviembre"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147.00","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [789,"8","noviembre","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381.00","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [790,"9","noviembre","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [791,"10","noviembre","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.20","Por definir ","PRUEBA","Trmicas "],
    [792,"11","noviembre","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panam","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [793,"12","noviembre","Generadora de Gatun, S.A.","Proyecto Gatn","Coln","Coln","Cristobal","670.00","Por definir ","PRUEBA","Trmicas "],
    [794,"13","noviembre","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9.00","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [795,"14","noviembre","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.40","04-oct-19","Operacin Comercial","Fotovoltaica "],
    [796,"15","noviembre","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.10","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [797,"16","noviembre","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [798,"17","noviembre","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4\n7 de febrero de 2024 (Etapa 5)","Operacin Comercial","Fotovoltaica "],
    [799,"18","noviembre","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.52","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [800,"19","noviembre","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [801,"20","noviembre","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.50","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [802,"21","noviembre","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [803,"22","noviembre","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [804,"23","noviembre","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [805,"24","noviembre","Gena Solar, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [806,"25","noviembre","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [807,"26","noviembre","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [808,"27","noviembre","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica "],
    [809,"28","noviembre","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [810,"29","noviembre","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.50","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [811,"30","noviembre","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16.00","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [812,"31","noviembre","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [813,"32","noviembre","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [814,"33","noviembre","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [815,"34","noviembre","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [816,"35","noviembre","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10.00","Por definir ","PRUEBA","Fotovoltaica"],
    [817,"36","noviembre","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [818,"37","noviembre","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.90","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [819,"38","noviembre","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3.00","Por definir ","PRUEBA","Fotovoltaica"],
    [820,"39","noviembre","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [821,"40","noviembre","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [822,"41","noviembre","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10.00","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [823,"42","noviembre","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120.00","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [824,"43","noviembre","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3.00","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [825,"44","noviembre","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\n23 de agosto de 2023  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [826,"45","noviembre","AES Panam S.R.L","Mayorca ","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [827,"46","noviembre","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [828,"47","noviembre","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","19-abr-24","Operacin Comercial","Fotovoltaica"],
    [829,"48","noviembre","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [830,"49","noviembre","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n21 de mayo de 2024 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [831,"50","noviembre","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","20-jun-24","Operacin Comercial","Fotovoltaica"],
    [832,"51","noviembre","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [833,"52","noviembre","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [834,"53","noviembre","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.50","Por definir ","Prueba ","Fotovoltaica"],
    [835,"54","noviembre","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25.00","Por definir ","Prueba ","Fotovoltaica"],
    [836,"55","noviembre","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.50","21 de marzo de 2024 (II Fase)\n12 de julio de 2023 (I Fase)\n en prueba (III Fase)","Operacin Comercial","Fotovoltaica"],
    [837,"56","noviembre","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.90","27 de mayo de 2024 (Fase II)\n10 de julio de 2023(Fase I)","Operacin Comercial","Fotovoltaica"],
    [838,"57","noviembre","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","22-ago-24","Operacin Comercial","Fotovoltaica"],
    [839,"58","noviembre","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [840,"59","noviembre","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [841,"60","noviembre","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","23.90","Por definir ","Prueba ","Fotovoltaica"],
    [842,"61","noviembre","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [843,"62","noviembre","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [844,"63","noviembre","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10.00","Por definir ","Prueba ","Fotovoltaica"],
    [845,"64","noviembre","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.90","Por definir ","Prueba ","Fotovoltaica"],
    [846,"65","noviembre","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5.00","Por definir ","Prueba ","Fotovoltaica"],
    [847,"66","noviembre","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [848,"67","noviembre","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [849,"68","noviembre","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.90","20-jun-24","Operacin Comercial","Fotovoltaica"],
    [850,"69","noviembre","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [851,"70","noviembre","MASPV Panama Inc .","Sunrise Maspv 2 ","Panama Oeste ","Zanguenga","Herrera","3.3","Por definir ","Prueba ","Fotovoltaica"],
    [852,"71","noviembre","Aguafuerte S.A.","Solarpro","Chiriqu -Bar-Progreso","Bar","Progreso","10","Por definir ","Prueba ","Fotovoltaica"],
    [853,"72","noviembre","Aquavoltaics, S.A.","SolarPro 2 ","Chiriqu -Bar-Progreso","Bar","Progreso","5","Por definir ","Prueba ","Fotovoltaica"],
    [854,"73","noviembre","Arrendadora Istmo Energy, S.A.","Chupampa ","Veraguas","Atalaya","Atalaya","7.5","Por definir ","Prueba ","Fotovoltaica"],
    [855,"74","noviembre","Argentum Solar, S.A.","Capira Solar","Panama Oeste","Capira","Ldice ","9.9","Por definir ","Prueba ","Fotovoltaica"],
    [856,"75","noviembre","Sunergy, I S.A. ","La Villa Solar ","Los Santos","Los Santos","La Villa ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [857,"76","noviembre","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55.00","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [858,"77","noviembre","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [859,"78","noviembre","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [860,"79","noviembre","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [861,"80","noviembre","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.50","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [862,"81","noviembre"," Parque  Elico Toabr, S.A.","Toabre","Cocle","Penonom-Toabre ","Tol","66.00","25 de abril de 2024","Operacin Comercial","Elicas"],
    [863,"","","","","","","","","","",""],
    [864,"","","","","","","","","","",""],
    [865,"No.","Mes","Empresa","Proyecto ","Provincia","Distrito","Corregimiento","MW","Fecha de Operacin Comercial","Estatus","Tecnologa "],
    [866,"1","diciembre","Island Power, S.A. (IPSA)","Sistemas  Aislados ( Yavisa, Garachin, Santa F , Boca de Cupe, Jaqu, La Palma, Ro Azcar; Otoque, San Miguel, Chepillo, Saboga, Taboga;Tucut, Nargan, Yaviza,Torty, La Miel (solar / trmico), Puerto Obaldia y Pedro Gonzlez)\nBocas Power Plant  S.A ( Isla Coln, Bastimento,Carenero y Solarte )","Bocas del Toro; Darin; Panam; Guna Yala","","","35","Operacin","Operacin","Trmicas "],
    [867,"2","diciembre","Seneca Energy, S.A. ","Palmas Bellas\n","Coln\n","Chagres \n","Palmas Bellas  \n","1.5","Operacin","Operacin","Trmicas "],
    [868,"3","diciembre","Seneca Energy, S.A. ","\nIsla Grande ","Coln\n","Portobelo","Isla Grande ","1.5","Operacin","Operacin","Trmicas "],
    [869,"4","diciembre","Seneca Energy, S.A. ","\nPalenque \n","Coln\n","Santa Isabel\n","Palenque \n","2","Operacin","Operacin","Trmicas "],
    [870,"5","diciembre","Celsia Centro Amrica, S.A.","Cativ","Coln","Coln ","Cativ","155","G6-G7-G8-G9-G10 ago-2008\nG2-G4-G5 nov-08, G1 nov-2008, G3 ene-2009","Operacin Comercial","Trmicas "],
    [871,"6","diciembre","Generadora del Atlntico, S.A.","Termo Coln","Coln ","Coln ","Cativ","150","G1 jul-09, G2 sep-09, \nG3 dic-09\nC. COMB 1+1  nov-10, C.COMB 2+1  dic-10","Operacin Comercial","Trmicas "],
    [872,"7","diciembre"," Pan-Am Generating Limited","Panam  I  y II","Panam Oeste ","Chorrera ","El Arado ","147","Enero de 2000\n8 de febrero 2016, 3 Motores adicionales .","Operacin Comercial","Trmicas "],
    [873,"8","diciembre","Gas Natural Atlantico  S. de R.L.","Costa Norte ","Coln","Coln","Cristbal","381","22 de Julio de 2019","Operacin Comercial","Trmicas "],
    [874,"9","diciembre","Tropitermica, S.A.","Tropitermica ","Coln","Coln","Cristbal","5.05","Por definir ","PRUEBA","Trmicas "],
    [875,"10","diciembre","Sparkle Power S.A.","Sparkle Power","Coln","Coln","Buena Vista ","49.2","Por definir ","PRUEBA","Trmicas "],
    [876,"11","diciembre","Pedregal Power Company, S de R.L.","Central Termoelectrica Pacora ","Panam","Panam","Pacora ","53.53","28 de enero de 2023","Operacin Comercial","Trmicas "],
    [877,"12","diciembre","Generadora de Gatun, S.A.","Proyecto Gatn","Coln","Coln","Cristobal","670","Por definir ","PRUEBA","Trmicas "],
    [878,"13","diciembre","Enel Renovable, S.R.L","Chiriqu","Chiriqu","San Lorenzo","San Juan ","9","03 de junio de 2015","Operacin Comercial","Fotovoltaica "],
    [879,"14","diciembre","Empresa de Generacin Elctrica , S.A. (EGESA)","Sarigua","Herrera","Parita","Puerto Limn","2.4","43742.00","Operacin Comercial","Fotovoltaica "],
    [880,"15","diciembre","Generacin Solar,   S.A.","Zona Franca Albrook","Panam","Panam","Ancn","0.1","15 de febrero de 2017","Operacin Comercial","Fotovoltaica "],
    [881,"16","diciembre","Divisa Solar  10 MW S.A.","Divisa Solar","Cocl","Aguadulce ","El Roble","9.99","19 de enero 2016","Operacin Comercial","Fotovoltaica "],
    [882,"17","diciembre","Farallon Solar 2, S.A.","Farrallon Solar 2\nEtapas 1,2,3,4 y 5","Cocl","Antn","Ro Hato","5.16","07 de diciembre de 2016\nEtapas 1,2,3,4\n7 de febrero de 2024 (Etapa 5)","Operacin Comercial","Fotovoltaica "],
    [883,"18","diciembre","Solar Azuero Venture, S.A.","Los ngeles","Los Santos","Los Santos.","Los Angeles","9.522","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [884,"19","diciembre","Solar Panam Venture, S de R.L.","Paris","Herrera","Parita","Pars","8.5","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [885,"20","diciembre","Solar Cocl Venture,  S de R. L. ","Cocl","Cocl","Penonom","Cocl","8.5","30 de marzo de 2017","Operacin Comercial","Fotovoltaica "],
    [886,"21","diciembre","Empresa Nacional de Energa,  S.A.","Bugaba","Chiriqu","Bugaba","Sotov","2.56","Por definir ","PRUEBA","Fotovoltaica "],
    [887,"22","diciembre","Hidroiberica , S.A. ","El Fraile Solar I ","Cocl","Nat ","Guzmn","0.48","04 de abril de 2017","Operacin Comercial","Fotovoltaica "],
    [888,"23","diciembre","Enel Renovable, S.R.L","Generadora Solar Caldera","Chiriqu","Bar","Progreso","5.45","Por definir ","PRUEBA","Fotovoltaica "],
    [889,"24","diciembre","Gena Solar, S.A.","Don Flix  (Etapa I y II )","Cocl","Aguadulce ","El Roble","9.99","22 de abril de 2022","Operacin Comercial","Fotovoltaica "],
    [890,"25","diciembre","Enel Renovable, S.R.L","Sol de David","Chiriqu","Bar","Progreso","9.99","Por definir ","PRUEBA","Fotovoltaica "],
    [891,"26","diciembre","Enel Renovable, S.R.L","Milton Solar","Cocl","Aguadulce ","El Roble","10","Por definir ","PRUEBA","Fotovoltaica "],
    [892,"27","diciembre","Enel Renovable, S.R.L","Vista Alegre","Cocl","Aguadulce ","El Roble","10","Por definir ","PRUEBA","Fotovoltaica "],
    [893,"28","diciembre","Enel Renovable, S.R.L","Sol Real","Cocl","Aguadulce ","El Roble","10","Por definir ","PRUEBA","Fotovoltaica"],
    [894,"29","diciembre","PSZ1 S.A.","El Espinal","Los Santos","Guarar","El Espinal","8.5","21 de agosto de 2017","Operacin Comercial","Fotovoltaica"],
    [895,"30","diciembre","Panam Solar 2, S. A.","Pocr","Cocl","Aguadulce","Aguadulce","16","31 de enero de 2019","Operacin Comercial","Fotovoltaica"],
    [896,"31","diciembre","Concepto Solar, S.A.","Bejuco Solar ","Panama Oeste","Chame ","Bejuco ","0.96","22 de abril de 2019","Operacin Comercial","Fotovoltaica"],
    [897,"32","diciembre","Tecnisol I S.A.","Ikako","Chiriqu","David","David","10","Por definir ","PRUEBA","Fotovoltaica"],
    [898,"33","diciembre","Tecnisol  III S.A.","Ikako II","Chiriqu","David","David","10","Por definir ","PRUEBA","Fotovoltaica"],
    [899,"34","diciembre","Tecnisol II S.A.","IkaKo I","Chiriqu","David","David","10","Por definir ","PRUEBA","Fotovoltaica"],
    [900,"35","diciembre","Tecnisol  IV S.A.","Ikako III","Chiriqu","David","David","10","Por definir ","PRUEBA","Fotovoltaica"],
    [901,"36","diciembre","Enel Renovable, S.R.L","Estrella Solar","Cocl","Aguadulce","Jagito","5.66","Por definir ","PRUEBA","Fotovoltaica"],
    [902,"37","diciembre","Panasolar Generation, S.A.","Panasolar","Cocl","Aguadulce","El Roble ","9.9","27 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [903,"38","diciembre","Solpac Investment, S.A.","Pacora  II  ","Panam","Chepo ","Pacora ","3","Por definir ","PRUEBA","Fotovoltaica"],
    [904,"39","diciembre","Solar Development Panam, S.A.","Santiago Gen 1","Herrera","Pes","Pes","4.98","30 de abril de 2021","Operacin Comercial ","Fotovoltaica"],
    [905,"40","diciembre","Photovoltaics Investment, Corp.","Ecosolar","Chiriqu ","Bar "," Progreso ","10","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [906,"41","diciembre","Photovoltaics Developments","Ecosolar 2","Chiriqu "," Bar","Progreso ","10","14 de julio de 2021","Operacin Comercial ","Fotovoltaica"],
    [907,"42","diciembre","Avanzalia Panam, S.A.","Penonom","Cocl ","Penonom ","El Coco","120","14 de diciembre de 2021","Operacin Comercial","Fotovoltaica"],
    [908,"43","diciembre","Electricidad Solar S.A.","Mendoza Solar","Panam Oeste ","La Chorrera","Mendoza","3","24 de febrero de 2022","Operacin Comercial","Fotovoltaica"],
    [909,"44","diciembre","Daconan Star Solar, S.A.","Daconan Solar Etapa  I, Etapa II  y \nEtapa III .","Veraguas","Santiago  ","La Pea","5.61","31 de enero de 2022 (II Fase)\n23 de febrero de 2022 (I Fase)\n23 de agosto de 2023  (III Fase) \n","Operacin Comercial (fase I y II)","Fotovoltaica"],
    [910,"45","diciembre","AES Panam S.R.L","Mayorca ","Los Santos","Pocr","Paraso ","9.97","16 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [911,"46","diciembre","AES Panam S.R.L","Pes Solar ","Herrera","Pes","Las Cabras ","9.97","27 de septiembre de 2021","Operacin Comercial","Fotovoltaica"],
    [912,"47","diciembre","Progreso Solar 20 MW, S.A.","La Esperanza Solar 20MW","Chiriqu","Bar","El Progreso","19.88","19 de abril de 2024","Operacin Comercial","Fotovoltaica"],
    [913,"48","diciembre","Celsolar S.A.","Prudencia ","Chiriqu","David"," Las Lomas","9.69","14 de enero de 2022","Operacin Comercial","Fotovoltaica"],
    [914,"49","diciembre","Solar Boqueron, S.A.","Macanosolar I y II","Chiriqu ","Boqueron ","Paraiso","4.75","20 de dic de 2021 (  I Fase)\n21 de mayo de 2024 (II Fase prueba)\n","Operacin Comercial","Fotovoltaica"],
    [915,"50","diciembre","Jaguito Solar 10 MW, S.A.","Jagito Solar","Cocl","Aguadulce","El Roble","9.88","20 de junio de 2024","Operacin Comercial","Fotovoltaica"],
    [916,"51","diciembre","AES Panam S.R.L","Caoba Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [917,"52","diciembre","AES Panam S.R.L","Cedro Solar ","Chiriqu "," Boqueron"," Boqueron","9.96","13 de junio de 2022","Operacin Comercial","Fotovoltaica"],
    [918,"53","diciembre","Mas PV Panama Inc","Sunrise MASPV 1","Panama Oeste","La Chorrera","Herrera","0.5","Por definir ","Prueba ","Fotovoltaica"],
    [919,"54","diciembre","Generadora Solar  Austral, S.A.","Madre Vieja ","Chiriqu","Bar","Progreso ","25","Por definir ","Prueba ","Fotovoltaica"],
    [920,"55","diciembre","Argentum Solar, S.A.","Ro de Jess\nEtapa I y  II","Veraguas","Ro de Jess ","Ro de Jess ","12.5","21 de marzo de 2024 (II Fase)\n12 de julio de 2023 (I Fase)\n en prueba (III Fase)","Operacin Comercial","Fotovoltaica"],
    [921,"56","diciembre","Oro  Solar, S.A.","Oro  Solar\nEtapa I y  II","Herrera ","Parita ","Parita ","9.9","27 de mayo de 2024 (Fase II)\n10 de julio de 2023(Fase I)","Operacin Comercial","Fotovoltaica"],
    [922,"57","diciembre","Andreas Power Energy, Corp.","Andreas Power ","Chiriqu","San Felix ","San Felix ","0.99","22 de agosto de 2024","Operacin Comercial","Fotovoltaica"],
    [923,"58","diciembre","Panasolar Green Energy Corp. ","Panasolar II","Cocl"," Aguadulce"," El Roble","5","Por definir ","Prueba ","Fotovoltaica"],
    [924,"59","diciembre","Panasolar Green  Power  S.A.","Panasolar III","Cocl"," Aguadulce"," El Roble","5","Por definir ","Prueba ","Fotovoltaica"],
    [925,"60","diciembre","Generadora Solar  El Puerto,  S.A.","Baco Solar ","Chiriqui","Bar","Progreso ","23.9","Por definir ","Prueba ","Fotovoltaica"],
    [926,"61","diciembre","Photovoltaics Business Corp.","Ecosolar 3","Chiriqui","Bar","Progreso ","10","Por definir ","Prueba ","Fotovoltaica"],
    [927,"62","diciembre","Photovoltaics Operations Corp.","Ecosolar 4","Chiriqui","Bar","Progreso ","10","Por definir ","Prueba ","Fotovoltaica"],
    [928,"63","diciembre","Photovoltaics Venture Corp.","Ecosolar 5","Chiriqui","Bar","Progreso ","10","Por definir ","Prueba ","Fotovoltaica"],
    [929,"64","diciembre","Pedregalito Solar Power S.A.","Pedregalito Solar Power ","Chiriqu","Alanje ","El Tejar ","9.9","Por definir ","Prueba ","Fotovoltaica"],
    [930,"65","diciembre","Ecoener Fotovoltaica Panama, S.A.","Parque Fotovoltaico Ecoener San Juan","Chiriqu","San Lorenzo","San Lorenzo ","5","Por definir ","Prueba ","Fotovoltaica"],
    [931,"66","diciembre","Sociedad Super Servicios, S.A.","Anton  Solar 1","Cocl","Antn","Ro Hato ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [932,"67","diciembre","Caldera Energy Corp.","Mendre Solar ","Chiriqu","Boquete ","Caldera ","5.5","Por definir ","Prueba ","Fotovoltaica"],
    [933,"68","diciembre","Solar Energy Park Enterprises, Inc.","Rodeo Solar ","Panam Oeste","San Carlos ","San Carlos ","9.9","20 de junio de 2024","Operacin Comercial","Fotovoltaica"],
    [934,"69","diciembre","Tinto Solar, S.A.","Chame Solar ","Panama Oeste","Chame ","El Libano ","19.8","Por definir ","Prueba ","Fotovoltaica"],
    [935,"70","diciembre","MASPV Panama Inc .","Sunrise Maspv 2 ","Panama Oeste ","Zanguenga","Herrera","3.3","Por definir ","Prueba ","Fotovoltaica"],
    [936,"71","diciembre","Aguafuerte S.A.","Solarpro","Chiriqu -Bar-Progreso","Bar","Progreso","10","Por definir ","Prueba ","Fotovoltaica"],
    [937,"72","diciembre","Aquavoltaics, S.A.","SolarPro 2 ","Chiriqu -Bar-Progreso","Bar","Progreso","5","Por definir ","Prueba ","Fotovoltaica"],
    [938,"73","diciembre","Arrendadora Istmo Energy, S.A.","Chupampa ","Veraguas","Atalaya","Atalaya","7.5","Por definir ","Prueba ","Fotovoltaica"],
    [939,"74","diciembre","Argentum Solar, S.A.","Capira Solar","Panama Oeste","Capira","Ldice ","9.9","Por definir ","Prueba ","Fotovoltaica"],
    [940,"75","diciembre","Sunergy, I S.A. ","La Villa Solar ","Los Santos","Los Santos","La Villa ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [941,"76","diciembre","Mercurio Solar, S.A.","San Carlos Solar","Panam Oeste ","San Carlos ","San Carlos ","9.99","Por definir ","Prueba ","Fotovoltaica"],
    [942,"77","diciembre","Greenwood Energy Central America Corp.","UP1","Chiriqu","David","David Sur","8.58","Por definir ","Prueba ","Fotovoltaica"],
    [943,"78","diciembre","UP2, S.A.","UP2","Chiriqu","David","David Sur","8.58","Por definir ","Prueba ","Fotovoltaica"],
    [944,"79","diciembre","UP3,S.A.","UP3","Chiriqu","David","David Sur","8.58","Por definir ","Prueba ","Fotovoltaica"],
    [945,"80","diciembre","UP4, S.A.","UP4","Chiriqu","David","David Sur","8.58","Por definir ","Prueba ","Fotovoltaica"],
    [946,"81","diciembre","AES Panam S.R.L","Nuevo Chagres Fase I","Cocl","Penonom","Cocl y el Coco","55","26 de febrero de 2018","Operacin Comercial","Elicas"],
    [947,"82","diciembre","UEP Penonom II, S. A.","Rosa de los Vientos (Etapa I y II)","Cocl","Penonom","Cocl y el Coco","102.5","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [948,"83","diciembre","UEP Penonom II, S. A.","Nuevo Chagres Fase 2  (Etapa I)","Cocl","Penonom","Cocl y el Coco","62.5","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [949,"84","diciembre","UEP Penonom II, S. A.","Portobello Bastillas (Etapa I)","Cocl","Penonom","Cocl y el Coco","32.5","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [950,"85","diciembre","UEP Penonom II, S. A.","Maran","Cocl","Penonom","Cocl y el Coco","17.5","19 de febrero de 2018","Operacin Comercial","Elicas"],
    [951,"86","diciembre"," Parque  Elico Toabr, S.A.","Toabr","Cocle","Penonom-Toabre ","Tol","66","25 de abril de 2024","Operacin Comercial","Elicas"]
]}