{
  "fields": [{"id":"_id","type":"int"},{"id":"Cod. Entidad","type":"numeric"},{"id":"Entidad","type":"text"},{"id":"Partida Presupuestaria","type":"text"},{"id":"Nombre del Proyecto","type":"text"},{"id":"Provincia","type":"text"},{"id":"Ley 2025","type":"numeric"},{"id":"Modificado 2025","type":"text"},{"id":"Ejecutado 2025","type":"numeric"},{"id":"% Ejecuci¢n (sobre Modificado)","type":"numeric"},{"id":"Costo Total del Proyecto","type":"text"},{"id":"% Avance F¡sico\n(Mayo)","type":"text"},{"id":"Observaciones referente al avance f¡sico","type":"text"},{"id":"Infraestructura (S¡/No)","type":"text"},{"id":"Fase Administrataiva","type":"text"},{"id":"En ejecuci¢n (S¡/No)","type":"text"},{"id":"Causales de Afectaci¢n","type":"text"},{"id":"Observaciones (referente a obras detenidas)","type":"text"}],
  "records": [
    [1,2,"Contralor¡a General de la Rep£blica","","TOTAL","",0,"1,249,731",0,0,"1,249,731","0.0%","","","","","",""],
    [2,2,"Contralor¡a General de la Rep£blica","002.1.2.01.01","Reparaci¢n y Equipamiento de Instalaciones","Panam ",0,"372,243",0,0,"372,243","0"," A finales de mayo se asignaron recursos presupuestarios al presupuesto de inversi¢n de la Contralor¡a General de la Rep£blica, a trav‚s de la aprobaci¢n de un cr‚dito adicional, por ello no se muestra ejecuci¢n ni avance f¡sico. ","","","","",""],
    [3,2,"Contralor¡a General de la Rep£blica","002.1.2.01.03","Mejoramiento de Inst. de las Oficinas Reg. de la Contralor¡a","Nivel Nacional",0,"252,597",0,0,"252,597","0","","","","","",""],
    [4,2,"Contralor¡a General de la Rep£blica","002.1.2.01.02","Reposici¢n de Equipo de Transporte Terrestre - Fase II","Nivel Nacional",0,"0",0,0,"0","0","","","","","",""],
    [5,2,"Contralor¡a General de la Rep£blica","002.1.5.01.01","Equipamiento Institucional","Nivel Nacional",0,"624,891",0,0,"624,891","0","","","","","",""]
]}
