  "fields": [{"id":"_id","type":"int"},{"id":"Id del proyecto","type":"text"},{"id":"Nombre del Proyecto","type":"text"},{"id":"Monto Total","type":"text"},{"id":"Estatus (Según avance Físcico)","type":"text"},{"id":"Fecha de Inicio","type":"text"},{"id":"Fecha de Fin","type":"text"},{"id":"% Avance \nFísico","type":"text"},{"id":"% Avance \nFinanciero","type":"text"},{"id":"UNIDAD EJECUTORA DEL MOP","type":"text"},{"id":"Etapa del Proyecto","type":"text"},{"id":"URL","type":"text"}],
  "records": [
    [1,"AL-1-85-17","Ampliación a 6 carriles Corredor de las Playas entre La Chorrera- Santa Cruz, Provincia de Panamá Oeste.","B/.282,181,670.70","A Tiempo","A Tiempo","28/11/24","59.00%","23.76%","OPE","Ejecución","https://contratistavisible.com/project/1568378807256x887143500544999400"],
    [2,"UAL-1-14-2022","Estudios, diseño, Construcción y Financiamiento del puente vehicular sobre el Rio Bayano. (COQUIRA)","B/.22,516,034.21","A Tiempo","26/07/22","17/07/24","63.00%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1659724197916x468098043400683500"],
    [3,"UAL-1-14-2021","Rehabilitación para los caminos de producción agropecuarios, para la provincia de Bocas del Toro- Renglón 6.","B/.5,345,970.28","Atrasado","04/04/22","25/09/23","35.50%","1.21%","DNI","Ejecución","https://contratistavisible.com/project/1654781628805x846491526622609400"],
    [4,"AL-1-57-17","Diseño y construcción de intercambiador a desnivel circunvalación Chitré – 52m., en la provincia de Herrera.","B/.31,528,712.65","Atrasado","17/11/17","01/05/25","35.14%","16.92%","DNI","Ejecución","https://contratistavisible.com/project/1570722529188x885029482804543500"],
    [5,"UAL-1-10-2021","Rehabilitación para los caminos de producción agropecuarios, para la provincia de Herrera- Renglón 2","B/.4,657,525.25","Atrasado","17/02/22","11/08/23","74.48%","5.36%","DNI","Ejecución","https://contratistavisible.com/project/1645543322869x628211350182559700"],
    [6,"UAL-1-42-2022","Rehabilitación y financiamiento de las Calles del Distrito de Panamá- Grupo 4","B/.21,215,238.15","A Tiempo","01/02/23","31/01/25","56.61%","0.00%","DINAMAN","Ejecución","https://contratistavisible.com/project/1660063160798x804780323597713400"],
    [7,"UAL-1-26-2022","Construcción y financiamiento de la circunvalación costera de Playa Paunch- Playa Bluff- Boca de Drago (FASE B)","B/.41,878,049.09","Atrasado","22/05/23","22/05/25","5.24%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1660057179048x757423331737600000"],
    [8,"UAL-1-19-2020","Construcción Carretera Chumico - Cerro (Alto) Tolica -Guayabito, 19.0 km., Comarca Ngäbe Buglé.","B/.15,225,649.53","Detenido","20/05/21","19/05/23","25.23%","10.04%","DNI","Resuelto Administrativamente","https://contratistavisible.com/project/1614785641447x475318480144171000"],
    [9,"UAL-1-24-2022","Diseño, construcción, rehabilitación y financiamiento de calles en el Distrito de Penonomé, renglón 2.","B/.18,085,689.58","A Tiempo","27/12/22","25/12/24","54.50%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1684764910977x621028828493905900"],
    [10,"UAL-1-59-2021","Diseño, Construcción para la rehabilitación y financiamiento de Paso Canoa - Río Sereno - Piedra Candela","B/.66,461,991.94","Atrasado","01/07/22","29/06/24","59.46%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1657198820289x722731570780438500"],
    [11,"AL-1-88-17","Diseño y construcción de calles del Distrito de Colón, 38.85 km., provincia de Colón.","B/.42,586,566.39","Terminado","03/05/18","30/03/23","100.00%","36.71%","DNI","Finalización","https://contratistavisible.com/project/1568644645127x703919043700064300"],
    [12,"UAL-1-18-2022","Diseño, Construcción y financiamiento de la carretera El Llano - Puerto Cartí.","B/.24,583,324.10","A Tiempo","25/10/22","25/10/2024","54.50%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1660055004338x826015133055582200"],
    [13," UAL-1-05-2022","Rehabilitación y financiamiento de la vía la Feria- Playa Paunch, Vía Big Creek- Bocas del Drago y Calles internas de Isla Colón . (Fase A).","B/.88,439,875.73","Atrasado","15/07/22","03/07/24","28.02%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1658347628796x790914738017534000"],
    [14,"UAL-1-39-2022","Rehabilitación y financiamiento de las calles del distrito de Panamá- Renglón 1","B/.25,673,368.71","A Tiempo","01/02/23","01/02/25","29.90%","0.00%","DINAMAN","Ejecución","https://contratistavisible.com/project/1677870289364x733897396243660800"],
    [15,"UAL-1-32-2022","Rehabilitación Asfaltando Calles de Alanje.","B/.8,463,564.94","Atrasado","29/12/22","20/06/24","40.14%","17.26%","DINAMAN","Ejecución","https://contratistavisible.com/project/1674505479866x512648004792221700"],
    [16,"UAL-1-54-2021","Rehabilitación y financiamiento del Boulevard entrada a Las Tablas y la circunvalación Vía Pedasí.","B/.6,294,690.27","Atrasado","08/08/22","29/01/24","39.26%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1660589970532x773145465907314700"],
    [17,"UAL-1-13-2022","Diseño, construcción y financiamiento de calles y alcantarillados de Macaracas.","B/.31,095,883.42","Atrasado","26/08/22","10/02/25","14.68%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1660056047343x466619590439075840"],
    [18,"UAL-1-29-2022","Diseño y Construcción de la Vía Summit- Gamboa.","B/.9,850,000.00","A Tiempo","27/02/23","24/08/2024","22.00%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1659971015423x334334928605675500"],
    [19,"UAL-1-40-2022","Rehabilitación y financiamiento de las calles del distrito de Panamá- Renglón 2","B/.13,525,361.28","A Tiempo","01/02/23","01/02/25","32.70%","0.00%","DINAMAN","Ejecución","https://contratistavisible.com/project/1678207699807x684511547369717800"],
    [20,"UAL-1-12-2022","Estudio, diseño, construcción y financiamiento de la carretera Panamericana desde Yaviza a Pinogana y Puentes sobre el Río Chucunaque y Tuira.","B/.45,046,985.34","Atrasado","14/07/22","30/12/24","25.50%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1658345620851x946653244575711200"],
    [21,"UAL-1-16-2022","Diseño, Construcción y financiamiento del intercambiador entrada a la Cabima.","B/.23,799,867.77","Atrasado","13/09/22","01/03/25","15.14%","0.00%","OPE","Ejecución","https://contratistavisible.com/project/1660055346576x389874785801469950"],
    [22,"UAL-1-41-2022","Rehabilitación y financiamiento de las calles del distrito de Panamá- Renglón 3","B/.28,552,874.97","A Tiempo","03/02/23","03/02/25","44.40%","0.00%","DINAMAN","Ejecución","https://contratistavisible.com/project/1678222225004x716519678028546000"],
    [23,"UAL-1-34-2022","Diseño, construcción, rehabilitación y financiamiento de Calles y caminos del Distrito de Boquerón.","B/.43,339,559.64","A Tiempo","02/03/23","20/04/25","23.41%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1660062662301x294855574112960500"],
    [24,"UAL-1-17-2022","Estudio, Diseño, Construcción y Financiamiento para la Rehabilitación y Ampliación a Cuatro Carriles de la Vía Transístmica entre Villa Grecia y el Puente de Don Bosco (Chilibre  en la provincia de Panamá.","B/.41,338,708.21","A Tiempo","30/08/22","23/02/25","11.55%","0.00%","OPE","Ejecución","https://contratistavisible.com/project/1660056569383x259762243485040640"],
    [25,"UAL-1-07-2022","Estudio, diseño, construcción y financiamiento de la Carretera Coclesito - Kankintú","B/.71,903,902.12","A Tiempo","14/07/22","30/12/24","44.00%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1658352578851x973836547486646300"],
    [26," AL-1-156-13","Construcción de Intercambiador Vial en la Carretera Panamericana (Howard), 3.28 km. Tramo: Puente de Las Américas – Arraijan, Panamá Oeste.","B/.45,341,525.53","Atrasado","23/04/14","11/01/23","99.99%","50.50%","OPE","Finalización","https://contratistavisible.com/project/1569870994160x535327148508446700"],
    [27,"AL-1-70-16","Construcción del Camino Tambo -San Miguel Centro, 16.50 km., Penonomé, provincia de Coclé.","B/.12,324,426.00","Terminado","16/11/16","30/12/22","99.65%","82.54%","DNI","Finalización","https://contratistavisible.com/project/1568819965098x293308134380273660"],
    [28,"UAL-1-33-2021","Corte y mejoramiento  de Llano Culebra hasta Cerro Gallote. ","B/.3,170,426.05","Terminado","01/07/21","12/02/23","100.00%","87.38%","DINAMAN","Finalización","https://contratistavisible.com/project/1645643156841x204548762238189570"],
    [29,"UAL-1-35-2021","Corte y mejoramiento de camino: La vuelta en el Distrito de David emplanada del Chorcha en Besikó.","B/.4,451,200.00","Atrasado","23/08/21","11/04/23","99.99%","96.73%","DNI","Finalización","https://contratistavisible.com/project/1645645515056x404915533219102700"],
    [30,"AL-1-31-18","Diseño y construcción de camino La Encantadita-Limón,13.20 km. Chagres, de la provincia de Colón.","B/.10,304,810.53","Terminado","06/05/19","07/02/2024","100.00%","78.84%","DNI","Finalización","https://contratistavisible.com/project/1568646439105x980867977474211800"],
    [31,"AL-1-09-19","Diseño y construcción de caminos del distrito de Besikó – CPA- San Juan- Cieneguita-Quebrada Hacha -Lajero-Alto Potrero y Ramal hacia Camaron Arriba, Besikó, 23.14 km., comarca Ngäbe Buglé.","B/.20,557,910.94","Terminado","17/04/19","25/08/2021","100.00%","57.89%","DINAMAN","Finalización","https://contratistavisible.com/project/1568753319840x915014029967884300"],
    [32,"AL-1-36-17","Diseño y construcción de la carretera Almirante-Changuinola / Antigua ruta del tren y de los caminos: Valle Riscó-Punta Peña de Riscó, Valle Riscó Oriente Riscó, Valle Riscó-Nance Riscó, 35.60 km. Almirante, provincia de Bocas del Toro.","B/.55,950,135.38","Terminado","09/08/17","08/06/2022","100.00%","84.07%","DNI","Finalización","https://contratistavisible.com/project/1568393789731x827483561281716200"],
    [33,"UAL-1-22-2022","Estudio, Diseño, Construcción y Financiamiento del Corredor del Caribe (Carretera Quebrada Ancha – María Chiquita) ","B/.91,635,204.76","Atrasado","30/08/22","24/10/26","6.00%","0.00%","OPE","Ejecución","https://contratistavisible.com/project/1660062109642x993067595385536500"],
    [34,"AL-1-34-19","Diseño y construcción de la rehabilitación de la Vía Atalaya- Mariato - Quebro - Las Flores y mejoramiento del ramal a Varadero, 102 km. Atalaya, provincia de Veraguas.","B/.78,590,490.94","Terminado","18/11/19","31/01/23","100.00%","59.00%","DNI","Finalización","https://contratistavisible.com/project/1578934078556x659681161931653100"],
    [35,"AL-1-39-17","Diseño y Construcción para la Rehabilitación de Calles y Caminos del Distrito de Antón, 73.00 km., Antón, Provincia de Coclé.","B/.41,862,076.42","Atrasado","17/08/18","24/05/23","99.99%","51.63%","DNI","Ejecución","https://contratistavisible.com/project/1568404034153x380071136520044540"],
    [36,"AL-1-44-19","Diseño y Construcción para la Solución del Punto Crítico del deslizamiento de tierra en el Cerro San Pablo, La Pintada, El Harino, Marta, Provincia de Coclé.","B/.6,364,910.74","Terminado","16/10/19","18/02/22","100.00%","96.73%","DNI","Finalización","https://contratistavisible.com/project/1608743849013x135373337219563520"],
    [37,"UAL-1-31-2021","Mejoramiento del Camino Hato Rincón- Escopeta ","B/.4,491,751.59","Terminado","22/07/21","19/01/23","100.00%","96.73%","DNI","Ejecución","https://contratistavisible.com/project/1645644260376x912960663882039300"],
    [38,"\nAL-1-94-16","Proyecto de Diseño y Construcción para rehabilitación de Caminos del Distrito de Cañazas, 22.43 km., Reglón N°1; Provincia de Veraguas. ","B/.11,775,353.07","Terminado","12/02/16","21/03/23","100.00%","72.92%","DNI","Finalización","https://contratistavisible.com/project/1570637362479x893218527316017200"],
    [39,"\nAL-1-14-18","Rehabilitación Carretera Panamericana CPA / Gualaca-Chiriquí Grande, 98.00 km., Provincia de Chiriquí y Bocas del Toro.","B/.44,875,800.00","Terminado","27/08/18","31/03/23","100.00%","60.30%","DNI","Finalización","https://contratistavisible.com/project/1569265412186x255522912045629440"],
    [40,"AL-1-17-18","Rehabilitación de Caminos Rurales, 15.25 km., en el Distrito de Pesé, Provincia de Herrera.","B/.5,602,555.52","Terminado","10/09/18","22/10/22","100.00%","87.36%","DNI","Finalización","https://contratistavisible.com/project/1568922825575x743139427595845600"],
    [41,"UAL-1-37-2020","Rehabilitación de la carretera Las Tablas - Las Delicias Arriba, 22.28 km.; Distrito de Changuinola, Provincia de Bocas del Toro","B/.11,092,841.35","Terminado","07/05/21","15/03/23","100.00%","39.22%","DNI","Ejecución","https://contratistavisible.com/project/1619191686987x955701666572140500"],
    [42,"UAL-1-19-2021 \n","Rehabilitación de las Calles en el Corregimiento de Lajamina, 3.48 km.; provincia de Los Santos","B/.1,316,694.91","Terminado","07/05/21","30/01/22","100.00%","24.87%","DNI","Finalización","https://contratistavisible.com/project/1629389205186x849636597803515900"],
    [43,"UAL-1-30-2022","Rehabilitación Asfaltando las Calles de Tonosí.","B/.9,160,243.01","Atrasado","03/01/23","28/06/24","0.45%","0.00%","DINAMAN","Ejecución","https://contratistavisible.com/project/1674141193136x670630180398563300"],
    [44,"UAL-1-18-2021","Rehabilitación del camino entre Cerro Iglesia No.1 y Cerro Iglesia No.2; 2.0 km.; Comarca Ngäbe – Buglé.","B/.1,038,673.42","Terminado","02/07/21","08/01/23","100.00%","20.58%","DNI","Finalización","https://contratistavisible.com/project/1628517636804x691901165681246200"],
    [45,"\nUAL-1-05-20","Rehabilitación del Camino hacia fuerte San Lorenzo.","B/.9,205,948.17","Terminado","02/10/20","16/09/23","100.00%","42.95%","DNI","Finalización","https://contratistavisible.com/project/1602793639266x664372444218261500"],
    [46,"UAL-1-12-2020","Rehabilitación del caminos Vía la Martillada, Toabre, 4.3km., Penonomé, provincia de Coclé","B/.2,485,326.30","Terminado","06/12/19","19/01/22","100.00%","86.71%","DNI","Finalización","https://contratistavisible.com/project/1612551772703x839149615301263400"],
    [47,"UAL-3-45-2020","Sistema de Gestión de activos viales.","B/.2,453,009.82","Terminado","01/09/21","30/11/22","100.00%","80.67%","DEIDED","Finalización","https://contratistavisible.com/project/1642181292741x745010488895078400"],
    [48,"AL-1-17-17","Rehabilitación y mantenimiento de la Carretera Transístmica, tramo: Plaza Ágora - Estación de San Isidro, 8.0 km., provincia de Panamá.","B/.87,578,456.02","Atrasado","07/07/17","27/09/22","99.71%","76.82%","DNI","Ejecución","https://contratistavisible.com/project/1568400672472x441192330649141250"],
    [49,"AL-1-14-19","Diseño y construcción de estribos e instalación de Puentes Modulares - Renglón N°4, Panamá, Provincia de Panamá.","B/.2,530,434.56","Atrasado","06/08/19","31/02/2022","91.62%","78.21%","DINAMAN","Ejecución","https://contratistavisible.com/project/1575558119361x370877892417290240"],
    [50,"AL-1-67-15","Diseño y Construcción de la Rehabilitación y Ensanche de la Carretera Pedregal - Gonzalillo, Transístmica, 11.20 km., Provincia de Panamá. ","B/.127,176,599.29","Atrasado","04/01/16","31/07/22","99.81%","73.97%","OPE","Ejecución","https://contratistavisible.com/project/1568393645234x307645977812795400"],
    [51,"AL-1-20-18","Diseño y construcción de los estribos e instalación de Puentes Modulares en la provincia de Coclé, Herrera y los Santos, Renglón N°2.","B/.3,643,430.00","Atrasado","27/09/18","30/05/21","96.01%","69.94%","DINAMAN","Ejecución","https://contratistavisible.com/project/1570221860288x978964611528654800"],
    [52,"AL-1-05-19","Rehabilitación de calles en el Distrito de La Chorrera, corregimientos de: Amador, Barrio Balboa, Barrio Colón, El Arado, El Coco, Guadalupe y Puerto Caimito, 85 km., La Chorrera","B/.27,468,403.35","Atrasado","01/04/19","01/09/22","93.58%","76.66%","DINAMAN","Ejecución","https://contratistavisible.com/project/1568667556221x197951708367159300"],
    [53,"UAL-1-22-2021","Rehabilitación De La Carretera El Ejido - La Espigadilla - Tres Quebradas - Agua Buena; 13.07 km.; provincia de Los Santos.","B/.9,904,565.63","Terminado","17/05/21","16/05/23","100.00%","43.62%","DNI","Ejecución","https://contratistavisible.com/project/1629388778300x199676808930787330"],
    [54,"\nAL-1-36-19","Diseño y construcción para la Rehabilitación y ensanche de la carretera La Concepción / CPA -Cuesta Piedra – Volcán, 66.20 km., Bugaba, provincia de Chiriquí","B/.84,276,325.07","Terminado","28/10/19","11/03/23","99.99%","39.91%","DNI","Ejecución","https://contratistavisible.com/project/1574366237458x298858672368648200"],
    [55,"AL-1-12-18","Diseño y construcción para la rehabilitación de calles y caminos del Distrito de David, 40.80 km., Renglón 2, provincia de Chiriquí.","B/.24,243,209.87","Atrasado","13/11/19","11/03/23","97.61%","57.15%","DNI","Ejecución","https://contratistavisible.com/project/1569267259089x539577312967131140"],
    [56,"UAL-1-11-2021","Rehabilitación para los caminos de producción agropecuarios, para la provincia de Los Santos- Renglón 3","B/.5,069,520.00","Terminado","17/02/22","11/08/23","100.00%","14.85%","DNI","Ejecución","https://contratistavisible.com/project/1654700321144x458865244885221400"],
    [57,"AL-1-40-19","Diseño, construcción del puente vehicular Gemelo sobre el Río Chico, Lado Sur, Carretera Panamericana, tramo : David - Concepción, Provincia de Chiriquí.","B/.6,177,701.40","Terminado","06/07/21","30/05/23","100.00%","41.22%","DNI","Finalización","https://contratistavisible.com/project/1628595304111x214515171158917120"],
    [58,"AL-1-25-19","Diseño y Construcción para la rehabilitación calles del Distrito de Penonomé, Renglón 1, 45.35 km., provincia de Coclé","B/.22,400,000.00","Atrasado","13/09/19","11/03/23","94.47%","59.30%","DNI","Ejecución","https://contratistavisible.com/project/1575572358428x172008048273129470"],
    [59,"AL-1-64-16","Proyecto de Estudio, Diseño y Construcción para la rehabilitación de Caminos del Distrito de Capira, 64.15 km., Provincia de Panamá Oeste.","B/.34,045,788.41","A Tiempo","07/10/16","06/09/24","88.94%","66.28%","DNI","Ejecución","https://contratistavisible.com/project/1570740512848x556198860039913500"],
    [60,"UAL-1-13-2020","Diseño y construcción para la rehabilitación de la carretera Gatún-Miguel de la Borda, 67.70 km., Distrito de Chagres, Provincia de Colón","B/.41,951,071.98","Atrasado","02/10/20","21/03/23","94.40%","37.09%","DNI","Ejecución","https://contratistavisible.com/project/1602794102121x379364098633105400"],
    [61," UAL-1-53-21","Rehabilitación y financiamiento de las carreteras Ocú- Las Minas - Valle Rico- Señales- El Potrero Ocú.","B/.12,669,977.07","Atrasado","26/04/22","18/10/23","97.26%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1651838758810x651261182754684900"],
    [62,"AL-1-48-18","Rehabilitación de Calles del distrito de Panamá  Plan Manos a la Obra, corregimiento de Las Garzas, Mañanitas, Pacora, Pedregal,  tocumen, 24 de diciembre y San Martin 140.0 km., Grupo 3, provincia de Panamá.","B/.66,943,589.06","Atrasado","28/03/19","24/03/23","89.05%","75.38%","DINAMAN","Ejecución","https://contratistavisible.com/project/1568403733589x994974672159768600"],
    [63,"AL-1-49-18","Rehabilitación de calles Distrito de panamá, corregimiento de Alcalde Díaz, Caimitillo, Chilibre y Ernesto Córdoba, 91.00 km. Grupo 4, provincia de Panamá.","B/.42,815,545.44","A Tiempo","01/04/19","26/09/24","65.00%","37.93%","DINAMAN","Ejecución","https://contratistavisible.com/project/1568401422312x994801991697301500"],
    [64,"AL-1-86-17","Diseño y construcción puente peatonal sobre interamericana (Penonomé), provincia de Coclé.","B/.8,922,226.29","Atrasado","06/03/18","08/06/23","84.48%","51.72%","DNI","Ejecución","https://contratistavisible.com/project/1579705215156x420875934181359600"],
    [65,"UAL-1-42-2021 ","Carretera de Soná hasta Pixvae en Veraguas (Diseño, Construcción y Financiamiento del Camino San José-Calidonia-Platanares-Pixvae)","B/.39,973,632.30","A Tiempo","06/09/21","23/02/24","96.00%","48.36%","DNI","Ejecución","https://contratistavisible.com/project/1631721633874x639699579070054400"],
    [66,"UAL-1-03-2022","Diseño, contrucción, suministro y Financiamiento de Puentes para Progreso","B/.85,136,240.32","Atrasado","14/06/22","09/07/23","92.25%","0.00%","DINAMAN","Ejecución","https://contratistavisible.com/project/1658346908639x253874942547066880"],
    [67,"UAL-1-32-2021","Corte y mejoramiento al camino San Felix - Salto DupÍ, Mirono, Comarca Ngäbe Buglé","B/.2,539,815.13","Terminado","09/07/21","30/05/23","99.99%","96.73%","DNI","Finalización","https://contratistavisible.com/project/1645642897179x866063997159866400"],
    [68,"AL-1-16-18","Estudio, Diseño y Construcción de la vía Puerto Vacamonte - El Chumical; diseño de rehabilitación y adecuación de calzada Tramo, El Chumical - Veracruz; estudio, diseño y construcción de Puente sobre quebrada en Veracruz, 6.5 km., provincia de Panamá Oeste","B/.20,755,438.85","A Tiempo","18/12/18","31/05/24","84.00%","25.63%","DNI","Ejecución","https://contratistavisible.com/project/1570649731366x616374194307072000"],
    [69,"UAL-1-15-2021","Rehabilitación para los caminos de producción agropecuarios, para la provincia de Veraguas- Renglón 7","B/.8,100,079.72","Atrasado","24/02/22","18/08/23","92.10%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1646746005647x372320721034280960"],
    [70,"UAL-1-43-2020","Estudio, Diseño, Construcción y Financiamiento para la interconexión / Acceso vehicular, desde la Cinta Costera 3 - Calzada de Amador, 1.56 km., corregimiento de Ancón, provincia de Panamá.","B/.45,041,191.76","Atrasado","31/05/21","03/10/23","87.93%","63.45%","OPE","Ejecución","https://contratistavisible.com/project/1629141495058x568406886748782600"],
    [71,"UAL-1-08-2020","Rehabilitación de Los Caminos de Producción (Agropecuarios) de Tierras Altas, Corregimiento de Cerro Punta, Distrito de Tierras Altas, provincia de Chiriquí.","B/.4,247,900.00","A Tiempo","19/03/21","11/07/23","86.62%","60.62%","DNI","Ejecución","https://contratistavisible.com/project/1628164732494x161761238012919800"],
    [72,"UAL-1-39-2020","Rehabilitación de carreteras del distrito de Capira, Renglón no.1: Rehabilitación de carretera Caimito – Cañazas; provincia de Panamá Oeste.","B/.2,846,934.94","Atrasado","11/05/21","10/05/22","71.65%","13.01%","DNI","Ejecución","https://contratistavisible.com/project/1622227279220x999829872419799000"],
    [73,"UAL-1-61-21","Diseño y Construcción de las calles y avenidas internas del Valle de Antón.","B/.8,500,000.00","A Tiempo","04/03/22","02/03/24","69.41%","25.69%","DNI","Ejecución","https://contratistavisible.com/project/1647629403347x249007700053590000"],
    [74,"AL-1-23-17","Estudio, diseño, construcción y mantenimiento de obras para la ampliación y rehabilitación de la Carretera Panamericana, Tramo: Puente de Las Américas - Arraiján, Arraiján,11.00 km., Provincia de Panamá Oeste.","B/.413,168,040.22","Atrasado","27/09/17","27/09/23","78.85%","41.73%","OPE","Ejecución","https://contratistavisible.com/project/1568385758508x644144295156121600"],
    [75,"UAL-1-41-2021","Diseño, Construcción, Rehabilitación y Financiamiento de Calles y Caminos del distrito de Almirante y Bocas del Toro.","B/.33,304,831.74","A Tiempo","15/09/21","02/05/24","87.34%","50.00%","DNI","Ejecución","https://contratistavisible.com/project/1632320780673x307602119385415700"],
    [76,"UAL-1-38-2020","Rehabilitación de carreteras del Distrito de Capira Renglón No.4: Rehabilitación de Carreteras del Corregimiento de Trinidad; provincia de Panamá Oeste","B/.3,879,318.71","Atrasado","28/05/21","03/01/23","65.00%","3.97%","DNI","Ejecución","https://contratistavisible.com/project/1626443612672x383904492321243140"],
    [77,"UAL-1-09-21","Rehabilitación para los caminos de producción agropecuarios, para la Provincia de Coclé- Renglón 1.","B/.5,013,079.00","Atrasado","04/03/22","26/08/23","73.02%","5.77%","DNI","Ejecución","https://contratistavisible.com/project/1647630263571x872278252909232100"],
    [78,"UAL-1-08-2021","Estudio, Diseño , financiamiento y Construcción para la Rehabilitación de la Carretera Autopista-Puerto de Vacamonte","B/.57,887,884.07","Atrasado","28/05/21","14/11/23","65.90%","11.22%","DNI","Ejecución","https://contratistavisible.com/project/1628517023348x925696358099714000"],
    [79,"UAL-1-04-2022","Rehabilitación y financiamiento de CPA Las Tablas - Santa Ana - Playa Monagre - Playa El Rompío y Ramal Santa Ana- La Villa de Los Santos (La Nestlé).","B/.11,855,958.82","A Tiempo","29/07/22","28/07/24","80.65%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1659628968127x733832601169821700"],
    [80,"UAL-1-13-2021","Rehabilitación para los caminos de producción agropecuarios, para la provincia de Colón- Renglón 5","B/.4,140,278.70","Atrasado","04/02/22","29/07/23","68.03%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1660053701812x970359176129413100"],
    [81,"UAL -1-12-2021","Rehabilitación para los caminos de producción agropecuarios, para la provincia de Panamá Oeste- Renglón 4","B/.5,734,876.66","Atrasado","11/02/22","05/08/23","52.81%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1660259349910x557301804965298200"],
    [82,"UAL-1-06-2022 ","Carretera de la Panamericana hasta Boca Chica en Chiriquí (Diseño, Construcción y Financiamiento de la Carretera CPA- Boca Chica) ","B/.23,877,998.66","A Tiempo","01/06/22","17/11/24","75.20%","0.00%","DNI","Ejecución","https://contratistavisible.com/project/1654801467384x780292135689125900"],
    [83,"UAL-1-27-2021","Diseño, Construcción, Rehabilitación y Financiamiento de calles y caminos del distrito de Changuinola, 102 km.; provincia de Bocas del Toro.","B/.68,749,598.95","A Tiempo","11/08/21","30/07/25","73.00%","48.36%","DNI","Ejecución","https://contratistavisible.com/project/1629140964547x299823149681475600"],
    [84,"AL-1-08-19","Diseño y Construcción Paso Vehicular e Intercambiador Vial José Agustín Arango - Tocumen - Cabuya - CPA-24 de diciembre, 3.10 km., Provincia de Panamá.","B/.78,350,400.87","Atrasado","26/04/19","06/07/23","87.00%","6.51%","DNI","Ejecución","https://contratistavisible.com/project/1568300976493x858247257103007700"]
]}